Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137C005 + (ML20137C005)
- ML20137C006 + (ML20137C006)
- ML20137C009 + (ML20137C009)
- ML20137C013 + (ML20137C013)
- ML20137C014 + (ML20137C014)
- ML20137C016 + (ML20137C016)
- ML20137C017 + (ML20137C017)
- ML20137C018 + (ML20137C018)
- ML20137C019 + (ML20137C019)
- ML20137C021 + (ML20137C021)
- IR 05000903/2010031 + (ML20137C022)
- ML20137C023 + (ML20137C023)
- ML20137C024 + (ML20137C024)
- IR 05000334/1984030 + (ML20137C026)
- ML20137C027 + (ML20137C027)
- ML20137C029 + (ML20137C029)
- ML20137C030 + (ML20137C030)
- ML20137C031 + (ML20137C031)
- ML20137C032 + (ML20137C032)
- ML20137C034 + (ML20137C034)
- ML20137C035 + (ML20137C035)
- ML20137C037 + (ML20137C037)
- ML20137C039 + (ML20137C039)
- BSEP-97-0072, Forwards Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20137C040)
- ML20137C041 + (ML20137C041)
- ML20137C045 + (ML20137C045)
- ML20137C048 + (ML20137C048)
- ML20137C051 + (ML20137C051)
- ML20137C054 + (ML20137C054)
- IR 05000341/1985049 + (ML20137C055)
- ML20137C058 + (ML20137C058)
- ML20137C059 + (ML20137C059)
- ML20137C062 + (ML20137C062)
- IR 05000415/2005024 + (ML20137C063)
- ML20137C064 + (ML20137C064)
- IR 05000275/1985042 + (ML20137C065)
- AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid + (ML20137C068)
- ML20137C070 + (ML20137C070)
- ML20137C071 + (ML20137C071)
- 05000341/LER-1997-002, :on 970216,HPCI Sys Pump Discharge Valve Failed to Open.Caused by Failure of Pinion Gear Setscrew.Maint Procedure Controlling Work on Valve Mos Revised,Motor Shaft for Valve E4150-F006,spot Drilled & New Setscrew Installed + (ML20137C075)
- ML20137C076 + (ML20137C076)
- BECO-86-001, Application for Amend to License DPR-35,consisting of Proposed Change 86-01,revising Tech Spec Sections Re Operation of Recirculation Sys.Amend in Response to ASLB 840126 Order.Fee Paid + (ML20137C078)
- ML20137C079 + (ML20137C079)
- ML20137C081 + (ML20137C081)
- ML20137C082 + (ML20137C082)
- ML20137C084 + (ML20137C084)
- ML20137C088 + (ML20137C088)
- 05000454/LER-1997-004-01, :on 970215,thrust Bearings Were Installed Backwards on Rh & CS Pumps Due to Lack of Specific Sys/Component.Completion of Nwrs Written to Check End Play on Rh & CS Pump Motors Will Be Tracked + (ML20137C089)
- B11932, Forwards RCS Flow Measurement Uncertainty Analysis,In Response to 851114 Request for More Detail Re Error Analysis Methodology & Breakdown of Individual Instrument Error Components + (ML20137C091)
- ST-HL-AE-1521, Forwards Response to Draft SER Open Items D2.4-2 Re Essential Cooling Pond (ECP) Seepage Loss Rate & D2.4-6 Re ECP Heat Dissipation Capacity in DBA + (ML20137C093)
- NRC-97-0020, Provides 180-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20137C094)