IR 05000903/2010031
| ML20137C022 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, 05000903 |
| Issue date: | 11/22/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20137C005 | List: |
| References | |
| 50-346-85-28, NUDOCS 8511260409 | |
| Download: ML20137C022 (1) | |
Text
__
-_
.
.
e.
- Appendix NOTICE OF VIOLATION
!
Toledo Edison Company License No. NPF-3 As a result of the inspection conducted on September 3 through October 31, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:
10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures... of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures,...."
Contrary to the above, the licensee's procedures were inadequate for fabricating, installing, and inspecting the plant pressure retaining safety related flexible boot seals.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days Lf the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
Il n W
$b
'
~
Dated /
/
C. U. Pap,(riello, Director Division of Reactor Safety
.
8511260409 851122 PDR ADOCK 05000346