ML20137C019
| ML20137C019 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/16/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20137C023 | List: |
| References | |
| NUDOCS 8508220192 | |
| Download: ML20137C019 (2) | |
See also: IR 05000415/2005024
Text
'
14
AUG 161985
f
'
In Reply Refer To:
Dockets:
50-498/85-06
50-499/85-06
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. C. E. Johnson and D. L.
Garrison of this office during the period April 15 - May 24, 1985, of
activities authorized by NRC Construction Permits CPPR-128 and 129, for the
South Texas Project, Units 1 and 2, and to the discussion of our findings with
members'.of your staff at .the conclusion of the inspection.
Areas examined during the inspection included public meetings; site tours;
licensee action on previous inspection findings;-licensee identified items;
heating, ventilating, and air conditioning (HVAC) systems; and spent fuel
storage racks.
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
These findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the-clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
R : 81/8
1/B
B/1
C: RPB1
4
C
nson/rl
-
rrison
nstable
EHJohnson
/85
/85
g/ / /85
g/(b /85
g8220192850816
G
ADOCK 0500049g
i
t
>
- .
o
...
Houston Lighting & Power Company
-2-
Should you have any questions concerning this, inspection, we will be pleased to
discuss them with you.
Sincerely,
Orldnct SID0d B*
E. H. .)chnson
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
'1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/85-06
50-499/85-06
4
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas 77001
Brian Berwick, Esquire
Asst. Attorney General
Environmental Protection Div.
'
P. O. Box 12548, Capitol Station
- ..,
'
Lanny Alan Sinkin
Citizens Concerned About
Nuclear Power, Inc.
3022 Po'rter Street, N.W. #304
Washington, D.C.
20008
Charles Bechhoefer, Esquire
Chairman,. Atomic Safety & Licensing Board
U. S. Nuclear Regulatory Commission
Washington, D.C.
20555
.
Dr. James C. Lamb, . III
313 Woodhaven Road
Chapel Hill, North Carolina 27514
Frederick J. Shon
Administrative Law Judge
Atomic Safety and Licensing Board
i
U.S. Nuclear Regulatory Commission
20555
. Texas Dept. of Health Resources
bcc:
(see next page)
_ - _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ - - _ .
. .
- .
. ,
,
, .
Houston Lighting & Power Company
-3-
bec to DMB (1E01)
bcc distrib. by'RIV:
- RPB1
R.P.Denise, DRSP
j
- Resident . Inspector-0PS
R.D. Martin,' RA
Ll
- Resident Inspector-CONST
- EP&RPB
- Section Chief (RPB1/B)
- RIV FILE
i
- MIS SYSTEM
- RSTS Operator
- D. Weiss, LFMB (AR-2015)
- w/766
4
l
l
f-
t_
b
'
.
%
I
_ _ _ _ _ _ . _ _ _ . _ . _ _ _ _