Notice of Violation from Insp on 850415-0524
ML20137C031
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/16/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20137C023 List:
References
50-498-85-06, 50-498-85-6, 50-499-85-06, 50-499-85-6, NUDOCS 8508220194
Download: ML20137C031 (1)


See also: IR 05000415/2005024

Text

- . . . .

.

.

.

'

.

i

APPENDIX A

NOTICE OF VIOLATION

Houston Lighting and Power Docket: 50-498/499

South Texas Project Units 1 & 2 Permit: CPPR 128/129

1

During an NRC inspection conducted April 15 through May 24, 1985, a violation

of NRC requirements was identified. The violation involved failure to follow

procedures. In accordance with the " General Statement of Policy and Procedure

for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation

is listed below:

Failure to Properly Follow Procedure

Criterion V of Appendix B to 10 CFR Part 50 requires that activities

affecting quality be prescribed by and accomplished in accordance with

appropriate instructions, procedures, or drawings. This requirement is

part of the approved quality assurance plan description (QAPD) for South

Texas Project.

Procedure CSP-6, Rev. 2,' dated March 7, 1985, requires that hangers be

constructed in accordance with installation documents and to present

hangers in acceptable condition prior to quality centrol inspector's

review and that the HVAC craft supervisor assures conformance to the

installation documents, and assure inspections are performed.

Contrary to the above, the NRC inspector visually inspected

Support 1-5-0036-S022. The records indicated that the bolts were

torqued. Visual inspection indicated that these bolts were loose.

This is a Severity Level IV violation (10 CFR Part 2 Supplement'IE)

(498/50-8506-01)

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company is

hereby required to submit to this office, within 30 days of the date of the

letter transmitting this Notice, a written statement or explanation in reply,

including: (1) the reason for the violation if admitted, (2) the corrective

steps which have been taken and the results achieved; (3) corrective steps

which will be taken to avoid further violations; and (4) the date when full

compliance will be achieved. Where good cause is shown, consideration will be

given to extending your response time.

Dated at Arlington, Texas

this 16 day of August . 1985