Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000309/1985015 + (ML20136G584)
- ML20136G586 + (ML20136G586)
- ML20136G591 + (ML20136G591)
- ML20136G595 + (ML20136G595)
- ML20136G596 + (ML20136G596)
- ML20136G598 + (ML20136G598)
- ML20136G602 + (ML20136G602)
- IR 05000295/1996011 + (ML20136G604)
- ML20136G606 + (ML20136G606)
- ML20136G608 + (ML20136G608)
- ML20136G609 + (ML20136G609)
- ML20136G611 + (ML20136G611)
- 05000327/LER-1985-048-01, :on 851206,Maint Std Practices SQM-2 & SQM-57 Improperly Reviewed by Plant Operations Review Committee. Caused by Staff Error Due to Belief That Compliance W/Tech Specs Met.Procedures Reviewed + (ML20136G612)
- ML20136G614 + (ML20136G614)
- ML20136G618 + (ML20136G618)
- ML20136G619 + (ML20136G619)
- ML20136G621 + (ML20136G621)
- 05000482/LER-1985-082, :on 851202,casing Failure on Potential Transformer Caused Loss of Offsite Power to ESF Transformer XNB01.Caused by Failure of Metering & Relay Potential Transformer Monitoring.Sys Restored + (ML20136G623)
- 05000295/LER-1985-039-03, :on 851015,low Svc Water Header Pressure Caused Auto Start of Svc Water Pump Ib.Caused by Procedural Deficiency in Periodic Test PT-9.Cautionary Note Added to PT-9 + (ML20136G624)
- ML20136G625 + (ML20136G625)
- ML20136G627 + (ML20136G627)
- ML20136G634 + (ML20136G634)
- ML20136G639 + (ML20136G639)
- 05000289/LER-1985-003-02, :on 851201,main Generator Overexcitation Relay Tripped.Caused by Incorrect Operation of 59/81 Small Test Vessel Overvolts/Hertz (Overexcitation) Relay Due to Relay Drift,Misoperation or Improper Relay Setting + (ML20136G641)
- ML20136G649 + (ML20136G649)
- ML20136G651 + (ML20136G651)
- ML20136G652 + (ML20136G652)
- 05000312/LER-1985-023, :on 851205,reactor Trip Occurred on High RCS Pressure.Caused by Underfeeding of Main Feedwater Sys During Flow Scaling Procedure.Integrated Control Sys Modules Examined & Refurbished + (ML20136G654)
- ML20136G656 + (ML20136G656)
- ML20136G658 + (ML20136G658)
- ML20136G659 + (ML20136G659)
- LIC-97-0032, Forwards Preliminary Senior Reactor Operator License Applications,Per 961211 Request + (ML20136G660)
- B16328, Submits Util Results of Initial Reviews of Licensed Operator Records,Per 10CFR2.790(a)(6).NNECO Requests That Unredacted Version of Matrices & Nuclear Training Loit/Lout Audit Review, Be Withheld.Affidavit Supporting Request Encl + (ML20136G662)
- 05000458/LER-1985-050, :on 851203,discovered That RHR Pump & Valve Operability Quarterly Surveillances Missed for Subsys a, B & C During Last Surveillance Interval.Caused by Scheduling Error.Surveillances Performed + (ML20136G663)
- ML20136G664 + (ML20136G664)
- 1CAN118505, Monthly Operating Rept for Oct 1985 + (ML20136G667)
- ML20136G669 + (ML20136G669)
- ML20136G670 + (ML20136G670)
- ML20136G672 + (ML20136G672)
- ML20136G674 + (ML20136G674)
- 05000324/LER-1985-013-02, :on 851205,RWCU Sys Inlet Outboard Isolation Valve 2-G31-F004 Automatically Closed.Caused by Circuitry Fuse F18 Blowing Due to Undetectable Current Surge.Fuse Replaced & RWCU Sys Returned to Svc + (ML20136G675)
- ML20136G677 + (ML20136G677)
- ML20136G678 + (ML20136G678)
- ML20136G680 + (ML20136G680)
- ML20136G682 + (ML20136G682)
- ML20136G683 + (ML20136G683)
- ML20136G686 + (ML20136G686)
- ML20136G688 + (ML20136G688)
- 05000397/LER-1985-058, :on 851014,uncontrolled Quantities of Primary Containment Atmosphere Released to Environ W/O Being Treated During 24 H of Purge Operation.Caused by Failure of Standby Gas Treatment Fan 1B2.Purge Terminated + (ML20136G689)
- ML20136G691 + (ML20136G691)
- ML20136G692 + (ML20136G692)