ML20136G634

From kanterella
Jump to navigation Jump to search
Summarizes 840921 Telcon W/Congressman Badham Re Proposal Meeting Between Util & Commission
ML20136G634
Person / Time
Site: San Onofre 
Issue date: 09/21/1984
From: Palladino N
NRC COMMISSION (OCM)
To: Asselstine, Bernthal, Roberts
NRC COMMISSION (OCM)
Shared Package
ML20136F570 List:
References
FOIA-84-885 NUDOCS 8508190573
Download: ML20136G634 (1)


Text

'

g#

l*^

UNITED STATES j

NUCLEAR REGULATORY COMMISSION wAsHthGTON,0. C. 20566

)6

%{CT /

l September 21, 1984 CHAIRMAN HEMORANDUM FOR:

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:

Nunzio J. Palladino

SUBJECT:

TELEPHONE CONVERSATION WITH CONGRESSMAN BADHAM i

Congressman Badham (California) called this morning while I was out.

I returned the call shortly thereafter, j

He said he was calling about San Onofre, Unit 1.

He said that he j

understood representatives of the utility were in town and wanted to come and talk to me.

I said that the Commission was trying to clarify the desires of the utility to have a meeting with the Commission.

I noted that our General Counsel had been asked to contact the utility to determine whether or not they wanted to meet with the Commission.

l I said that the Commission at present has time available on October 4 to meet with the utility.

I also stated that I believed the utility should talk to the Commission'-- rather than a Tepresentative -- because it would be the full Commission that would make the San Onofre decision.

He thanked me for the information.

cc:

EDO OGC OPE 01 SECY t

l l

8508190573 050709 l

PDR FOIA BELL 84-885 PDR l-

  1. /8