Partial Response to FOIA Request for Records Re Facility Insp Rept 83-09.App a Documents Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Search Continuing for Addl Documents
ML20136G598
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/19/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20136G602 List:
References
FOIA-85-452 NUDOCS 8508190562
Download: ML20136G598 (4)


Text

r

.. ..;,jg 7DR-01 UNITED STATES 2

/ 'a NUCLEAR REGULATORY COMMISSION D E WASHINGTON, D, C. 20555

%,,,,,# July 19, 1985 Ms. Billie P. Garde Citizen's Clinic Director Governmental Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-452

Dear Ms. Garde:

This is in partial response to your letter dated June 19, 1985, in which you l requested, pursuant to the Freedom of Information Act (FOIA), all records related to Inspection Report 83-09 on the Braidwood plant.

The documents listed on the enclosed Appendix A are already available in the l NRC Public Document Room (PDR).

l l Copies of the documents listed on the enclosed Appendix B are being placed in

! the PDR in folder FOIA-85-452 under your name.

l l The NRC has not completed its review of the remaining documents subject to your request. We will respond as soon as that action is completed.

l Sincerely, M

Apm J. M. Felton, Director U Division of Rules and Records Office of Administation

Enclosures:

As stated l

l l

l

{

g,Jk ea

(IN THE PDR) APPENDIX A FOIA 85-452

1. 7/29/83 Documentation of QC Verification #8308050268
2. 12/13/83 Enforcement Conference Notice #8312190080
3. 5/7/84 Inspection Report 456/457 83-09 #8406050352
4. 6/26/84 Documentation of OC Verification #8407020335
5. 7/2/84 Report 456/84-09 #8407250140
6. 7/6/84 Licensee Response to 83-09 #8407310310
7. 7/23/84 -Licensee Response to 83-09 #8408100119
8. 7/26/84 RIII Thank you letter #8407310286
9. 8/3/84 Letter from RIII to licensee in response to 7/26 letter #8408100112
10. 11/6/84 SALP 4 Board Report #8411120255
11. 11/20/84 Report 456/84-21 #8412110544
12. 12/31/84 Report 456/84-34 #8501240668 13, 3/11/85 Licensee Response to 83-09 #8503260233
14. 3/14/85 SALP 4 Letter #8503180411 15, 3/18/85 Recor,t 456/84-42 #8503260359
16. 4/4/85 Report 456/85-07 #8504230138
17. 4/25/85 Licensee response to 83-09 #8505310077 18, 5/16/85 Inspection Report 456/85-15 #8505210352-c - -

APPENDIX-B FOIA 85-452

1. 07/06/83 Daily Report - RIII on Braidwood (1 page)
2. 09/11/83 Memorandum for Norelius from Davis on IE Braidwood 83-07 (1 page)
3. 10/31/83 Letter to Keopler from Swartz Interim Report (2 pages)
4. 12/02/83 Note to Spessard, Norelius, Streeter, Little from Knop on '

12/05/83 meeting (1 page)

5. 12/21/83 Letter to Davis from Farrar with transparencies for presentation (84pages)
6. 01/12/84 Letter to Davis from De1 George response to concerns (70 pages) l 7. June '84 PagesfromBCAPscopedocument, June'84(2pages) l
8. 06/05/84 Routing and Transmittal Slip for Branch Chiefs and Section Chiefs from Spessard (1 page)
9. 12/28/84 Letter to Lash from Kepnier (1 oage)
10. 02/18-22/85 Notes of J. F. Streeter written on meeting at Braidwood (6 pages)
11. 02/20/85 Ceco status summary of 83-09 items (1 page) l 12. 02/20/85 CECO handout material for 02/20/85 meeting between Ceco and NRC at Braidwood (19 pages) (HVACCORRECTIVEACTIONPROGRAMS)
13. 02/22/85 Action Item Control form (1 page) 14 04/08/85 Letter to Kepoler from Smith on corrective action programs (26pages)
15. 04/25/85 Letter to Kepoler from Smith on Actions taken for SALP Category 3 Issues (43 pages)
16. 04/25/85 Letter to Keppler from Smith with attachment (2 pages)
17. 05/28/85 Memorandum for Norelius from Little on resolution of ASME code '

nonconformances through multipary agreements (2 pages)

, 18. 06/07/85 Letter to Reed from Norelius confinning plans discussed (2 pages)

19. 06/11/85 Open Items List, Braidwood (5 pages) 20, 06/14/85 Memorandum for Nore11us from Little on " Top Twenty" Corrective actionprogramassignmentofresponsibility(3pages)

I

APPENDIX B ctnt. FOIA 85-452

21. 06/14/85 Memorandum for Norelius from Little on materials verification program Braidwood (1 page)

=22. Undated ASME Boiler and Pressure Vessel Code (4 pages)

23. Undated Braidwood NRC Construction Inspectior Experience (9 pages)
24. Undated Braidwood insoection report Thank you letter form (1 page)

O r

/

5' p' # .

-(

4

( , ,

_.%y 2

{' f.- , a 4 f ., =y l

i I

,1 o+ t i

f I'

~

(

+ (

.V f' g s

! . C2 y

( -

7 f.' on)mmonw:altiMdison First Nationat K _ _CNeago, lHinors

" Accrsss R; ply to. pet Ofhc2 Box 767

(

  • ,' / Chic go. Ilhnois 60690 s v s

October.31, 1983 i

Mr. James G. Keppler, Regional Administrator

- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road -

Glen Ellyn, IL 60137

Subject:

Braidwood St.ation Units 1 and 2

  • 10 CFR 50.55(e) Interim Report Documentation of QC Verification NRC Docket _Nos. 50-456/457 Reference (a): E. D. Swartz. letter to J. G. Keppler ^

dated July 29, 1983

}

Dear Mr. Keppler:

On July 1, 1983, the ommonwealth Edison Company Project Construction Department notified.Mr. Julian M. Hinds of your of fice of a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding the lack of adequate documentation that Q.C. verifications were performed at our Braidwoqd Station. For your tracking purposes, this deficienc provided our thirty (30)y was.as' signed Number 83-07. Reference (a) day report concerning this deficiency and indicated that the status of this dericiency was indeterminate The purpose of this letter is to pr~ ovide a status update. - - -

The Phillips, Getschow Co. has completed the inspection of the random sample selected by?.Sargent & Lundy as described in Reference (a). In the 2 inch and under sample, it was discovered that in one during fieldinstance, installation. different schedule spool pieces were r3 versed A'n.. additional 2 inch and under sample will be taken for heat numbers and also reviewed for design specification breaks.

sugsequent report. The results will be documented in a As stated in Reference (a), the Phillips Getschow .,

reinspection 1983. Based program is scheduled to be completed by December 1, u on this schedule, we expect to be in a position to provide a comp ete report by December 30, 1983.

l s v > !&o i f

e Q~~~f &

q

= -

t ..

! a g . e

~2-heve concerning this matter to this of.f.ine.Flease address any question

s Very truly yours,' '

l _ _

'?_ L'D E. D s Swa  ;

Nuclear Licensing; Administrator cc: RIII Inspector - Braidwood g, ,

Director of Inspection an.d ,(

Enforcement

1 h l 3 -

, w -

A T j

, i 7543N , ,. ,

\

l 1

. 4d

, s. . -.

8 l

1

. I

.~.

y -) 'y j  :

~, 1

. t

\,. , ;

-v , i i N) i

, \ ,4 i

e t

  • 9 - se F j
  • e 4

'1

$,. t i

' I

,[; n.

, .. _ h b,k fsy .

., !i

. .. g -

.s '