Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135H480 + (ML20135H480)
- ML20135H481 + (ML20135H481)
- ML20135H482 + (ML20135H482)
- ML20135H483 + (ML20135H483)
- ML20135H486 + (ML20135H486)
- ML20135H493 + (ML20135H493)
- ML20135H497 + (ML20135H497)
- ML20135H513 + (ML20135H513)
- ML20135H516 + (ML20135H516)
- ML20135H520 + (ML20135H520)
- ML20135H521 + (ML20135H521)
- ML20135H524 + (ML20135H524)
- ML20135H526 + (ML20135H526)
- ML20135H527 + (ML20135H527)
- ML20135H528 + (ML20135H528)
- ML20135H531 + (ML20135H531)
- ML20135H532 + (ML20135H532)
- ML20135H535 + (ML20135H535)
- W3P85-1476, Special Rept 85-001-00:on 850905,while in Mode 5,two Triazial Peak Accelerographs in Reactor Bldg Discovered Damaged by Heat & Vibration.Engineers Studying Possibility of Relocating Instruments + (ML20135H544)
- JAFP-85-0682, Cycle 7 Startup Test Rept + (ML20135H545)
- ML20135H550 + (ML20135H550)
- IR 05000628/2008008 + (ML20135H551)
- 05000395/LER-1985-020, :on 850820,containment Isolation Valve XVK-1633B Restored to Svc W/O post-maint Testing.Caused by Personnel Error.Testing on 850820 Showed Satisfactory Results.Procedures to Be Revised + (ML20135H552)
- ML20135H559 + (ML20135H559)
- ML20135H560 + (ML20135H560)
- ML20135H563 + (ML20135H563)
- ML20135H564 + (ML20135H564)
- ML20135H565 + (ML20135H565)
- 05000373/LER-1985-047, :on 850610,hydrogen Concentration Samples of Offgas Sys Collected at Incorrect Location.Caused by Poor Communication Between Operations Personnel.Sample Location Revised + (ML20135H566)
- IR 05000267/1985021 + (ML20135H569)
- ST-HL-AE-1349, Part 21 & Second Interim Deficiency Rept Re Core Exit Temp Measurement Sys.Initially Reported on 850509.Westinghouse Initiated Program to Resolve Deficiency.Next Rept Will Be Submitted by 860530 + (ML20135H572)
- ML20135H576 + (ML20135H576)
- ML20135H578 + (ML20135H578)
- ML20135H579 + (ML20135H579)
- ML20135H580 + (ML20135H580)
- ML20135H581 + (ML20135H581)
- ML20135H582 + (ML20135H582)
- ML20135H587 + (ML20135H587)
- ML20135H588 + (ML20135H588)
- ML20135H589 + (ML20135H589)
- ML20135H590 + (ML20135H590)
- IR 05000267/1985018 + (ML20135H591)
- ML20135H592 + (ML20135H592)
- IA-85-266, Final Response to FOIA Request for Info Re Proposed Sale of Union Carbide Reactor to Hoffmann-La Roche & Hearing Date. Addl Documents Not Located + (ML20135H592)
- ML20135H593 + (ML20135H593)
- ML20135H594 + (ML20135H594)
- 05000528/LER-1985-054, :on 850618,seal Leak Test Not Performed within 72 H Following Operation of Emergency Airlock on 100 Ft Level of Containment Bldg.Security Sys Test Procedure 20SP-02209 Will Be Modified to Notify of Test + (ML20135H595)
- ML20135H596 + (ML20135H596)
- ML20135H597 + (ML20135H597)
- 05000341/LER-1985-052, :on 850818,Div II Reactor Bldg Pressure High/ Low Plan Received.Caused by Reactor Bldg Supply Airflow Being Too High.Airflow Reduced & Div II of Standby Gas Treatment Initiated to Restore Pressure + (ML20135H607)
- ML20135H633 + (ML20135H633)