Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135D289 + (ML20135D289)
- 05000382/LER-1997-003, :on 970130,process Analog Computer Card Failed on Essential Services Chilled Water Train B.Caused by Open Fuse on Process Analog Control.New Pac Card Installed & Calibrated + (ML20135D294)
- ML20135D295 + (ML20135D295)
- ML20135D298 + (ML20135D298)
- 05000366/LER-1985-029-01, :on 850809,during Update of Seismic Category 1 Structures Settlement Rept,Personnel Noted Structure Settlement Surveillance Not Performed in Jan 1981 & 1984 & Aug 1984.Caused by Procedural Inadequacy + (ML20135D300)
- NRC-97-0015, Responds to NRC Re Violations Noted in Insp Rept 50-341/96-10.Corrective Actions:Critique of Incident Was Immediately Held & Test Was Then Reperformed Without Further Incident + (ML20135D301)
- ML20135D302 + (ML20135D302)
- 05000366/LER-1985-028-01, :on 850809 & 12 During line-by-line Review of Tech Specs & Implementing Procedures,Personnel Noted Three Surveillance Requirements for high-range Radiation Recorder Not Satisfied After Addition of Amends + (ML20135D305)
- ML20135D306 + (ML20135D306)
- ML20135D310 + (ML20135D310)
- ML20135D312 + (ML20135D312)
- IR 05000341/1996006 + (ML20135D313)
- ML20135D314 + (ML20135D314)
- ML20135D316 + (ML20135D316)
- ML20135D317 + (ML20135D317)
- ML20135D318 + (ML20135D318)
- ML20135D320 + (ML20135D320)
- ML20135D321 + (ML20135D321)
- ML20135D322 + (ML20135D322)
- HL-5263, Forwards Revised Relief Requests RR-P-10 & RR-P-12 + (ML20135D324)
- ML20135D326 + (ML20135D326)
- 05000277/LER-1996-011-01, :on 961030,main Steam Line Relief Valve Actuation Occurred Due to Inadvertent Movement of Control Switch.Reactor Operator Immediately Recognized Situation & Reclosed Valve.Event Discussed W/All Crews + (ML20135D327)
- ML20135D328 + (ML20135D328)
- 05000374/LER-1984-018-07, :on 840517,HPCS Pump Breaker Failed to Close. Caused by Switchgear Position Switch 52LS Failing to Make Contact When Breaker Racked Up.Position Switch Replaced, Readjusted & Inspected + (ML20135D333)
- ML20135D335 + (ML20135D335)
- ML20135D338 + (ML20135D338)
- ML20135D341 + (ML20135D341)
- ML20135D343 + (ML20135D343)
- ML20135D344 + (ML20135D344)
- B16270, Annual Operating Rept for 1996 + (ML20135D346)
- ML20135D347 + (ML20135D347)
- ML20135D350 + (ML20135D350)
- ML20135D352 + (ML20135D352)
- 05000373/LER-1984-016-07, :on 840307,instruments 1B21-N431B & 1B21-N413D Isolated During Performance of LIS-NB-115 & Not Returned to Svc.Caused by Personnel Error.Verification of Valves Covered by LIP-GM-35 Performed + (ML20135D353)
- ML20135D354 + (ML20135D354)
- ML20135D356 + (ML20135D356)
- ML20135D357 + (ML20135D357)
- ML20135D361 + (ML20135D361)
- ML20135D363 + (ML20135D363)
- ML20135D364 + (ML20135D364)
- ML20135D365 + (ML20135D365)
- ML20135D366 + (ML20135D366)
- ML20135D367 + (ML20135D367)
- ML20135D368 + (ML20135D368)
- ML20135D369 + (ML20135D369)
- ML20135D370 + (ML20135D370)
- ML20135D371 + (ML20135D371)
- ML20135D373 + (ML20135D373)
- ML20135D376 + (ML20135D376)
- ML20135D377 + (ML20135D377)
- IR 05000271/1996009 + (ML20135D378)