Forwards RAI Re License 960906 Amend Change Request 96-03093,which Requested Changes to App a of Plant, Units 1 & 2 FOLs
ML20135D295
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/27/1996
From: James Shea
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
TAC-M96574, TAC-M96575, NUDOCS 9612090330
Download: ML20135D295 (4)


Text

'

Mr. Georg) A. Hunger,. Jr. November 27, 1996 Director-Licsnsing, MC 62A-1 PECO Enargy Company i j'

Nuclear Group Headquarters Correspondence Control Desk

.P.O. Box No. 195' Wayne, PA 19087-0195 l

SUBJECT:

. REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO LICENSE i AMEN 0 MENT CHANGE REQUEST 96-03093, PEACH BOTTOM ATOMIC POWER j STATION, UNITS 2 AND 3 (TAC NOS, M96574 AND M96575) )

Dear Mr. Hunger:

By letter dated September 6, 1996, PECO Energy Company submitted License I

-Change Request (LCR) 96-03093 requesting changes to Appendix A of the Peach l Bottom Atomic' Power Station (PBAPS), Units 2 and 3, Facility.0perating Licenses. The proposed changes concern a revision to the surveillance  ;

requirements for the emergency diesel generators and the low pressure coolant injection (LPCI) pump start relays.

The staff has initiated a review of the application and determined that i additional information is needed to complets the ' review. The staff's RAI is included as an enclosure.

If you have any questions on this RAI, please#do.not' hesitate to contact me at (301) 415-1428. r I Sincerely;' V -

/S/ ",<  !

i Joseph W. Shea, Project Manager # 2 4 - Project Directorate..I-2 + '

1 Division of Reactor Projects "I/II

~

I Office. of Nuclear.. Reactor' Regulation 3

)

Docket Nos. 50-277/50-278

Enclosure:

RAI cc w/ enc 1: See next page ;eY '

DISTRIBUTION Docket File JZwolinski 0GC NGilles, TSB PUBLIC JStolz ACRS PDI-2 Reading JShea WPasciak, RGN-I SVarga M0'Brien RJenkins, EELB 0FFICE 'Phl'-2/(A PQ'l-2 /PM PDI-2/PD NAME hrh / J!Shea Jk1z DATE \\/[/96 a /-)-/96 Il /3796 0FFICIAL RECORD COPY .( DOCUMENT NAME: G:\SHEA\ PEACH \PB96574.RAI 9612090330 961127 )

" PDR ADOCK 05000277 \  ;

p PDR

) i

5%g g" k UNITED STATES g j f

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066Hoo1 o

'% , , # November 27, 1996 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO LICENSE AMENDMENT CHANGE REQUEST 96-03093, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M96574 AND M96575)

Dear Mr. Hunger:

By letter dated September 6, 1996, PECO Energy Company submitted License Change Request (LCR) 96-03093 requesting changes to Appendix A of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, Facility Operating Licenses. The proposed changes concern a revision to the surveillance requirements for the emergency diesel generators and the low pressure coolant injection (LPCI) pump start relays.

The staff has initiated a review of the application and determined that additional information is needed to complete the review. The staff's RAI is included as an encloture.

If you have any questions on this RAI, please do not hesitate to contact me at (301) 415-1428.

7 a Sinc 9ly,

. 1/ t

  • Jose ah . Shea, Project Manager Proj ect Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/50-278

Enclosure:

RAI cc w/ enc 1: See next page l

l 1

l RE0 VEST FOR ADDITIONAL INFORMATION PEACH BOTTOM ATOMIC POWER STATION (PBAPS). UNITS 2 AND 3 EMERGENCY DIESEL GENERATOR (EDG)/ LOW PRESSVRE COOLANT INJECTION (LPCI)

TECHNICAL SPECIFICATIONS i

1. On page 2 of the September 6,1996 application, PECO states:

l "The offsite source with a fixed Load Tap Changer in combination with the alternate offsite source are [is]

fully capable of supporting this out-of-sequence LPCI pump start to mitigate a LOCA on one PBAPS Unit and an orderly shutdown on the other Unit."

On page 3 of the September 6 application, PEC0 states:

"PECO Energy's Offsite Source Voltage Regulation Study has l been revised to document a 4kv system preload of the limiting running ECCS pump (LPCI) and the results of the analysis are acceptable."

Please provide the calculations that support these statements.

2. Under item (ii) of the No Significant Hazards Consideration discussion, PEC0 states that:

" ...the proposed changes do not introduce any modes of plant operation nor do they involve the installation of any new equipment or modifications to the plant.

Therefore, the possibility of a new or different kind of accident from any previously evaluated is not created as a result of the proposed action."

It is the staff's understanding that the alternate LPCI loading sequences referenced in the application were introduced by the modification which installed the EDG return to standby feature. It is therefore, difficult to understand how your conclusion in item (ii) is supported by saying that the proposed changes do not involve installation of any new equipment or modification.

Please clarify your rationale for concluding that the proposed change doesn't involve a modification and how the above recent modification affects your conclusion regarding item (ii) of your No Significant Hazards Consideration. Please provide a revised No Significant Hazards Consideration (addressing all three required points) which considers the requested clarification.

Enclosure a.

Mr. George A. Hunger, Jr. Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 i

cc:

J. W. Durham, Sr., Esquire Mr. Rich R. Janati, Chief Sr. V.P. & General Counsel Division of Nuclear Safety PECO Energy Company Pennsylvania Department of 2301 Market Street, S26-1 Environmental Resources Philadelphia, Pennsylvania 19101 P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer Route 1, Box 208 6 St. Paul Centre Delta, Pennsylvania 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3, Tawes State Office Building Annapolis, Maryland 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, Pennsylvania 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Bryan W. Gorman, Manager Baltimore, Maryland 21201 Joint Owners / External Affairs Interface Public Service Electric and Gas A. F. Kirby, III Company External Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 PECO Energy Company G. D. Edwards, Plant Manager Peach Bottom Atomic Power Station Route 1, Box 208 Delta, Pennsylvania 17314