February 25, 1997
.
Mr. John K. Wood
'
Vice President - Nuclear
-
Davis-Besse Nuclear Power Station
Centerior Service Company
5501 North State Route 2
l
Oak Harbor, OH 43449
SUBJECT:
ROUTINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/96014);
NOTICE OF VIOLATION AND EXERCISE OF ENFORCEMENT DISCRETION
4
Dear Mr. Wood:
The NRC completed an inspection at your Davis-Besse site with preliminary results presented
<
to members of your staff on January 24,1997. The final results were discussed with your
staff on February 13,1997. The enclosed report presents the details of that inspection.
Overall, we noted that equipment material condition was maintained at a high level. Good
4
interdepartmental communications was again noted, especially during conditions reouiring
response to onsite events.
>
Three violations of NRC requirements were identified during the inspection.
The first violation involved three examples of failure to follow procedures during the
performance of testing activities. We note that the procedure adherence problems found
during this inspection appear similar to procedural issues identified during other recent NRC
.
j
'
inspections. We are concemed that there may be one or more common underlying cause(s)
and contributing factors that have not yet been recognized and corrected.
i
The second violation related to your failure to include 10 CFR 70.24 required criticality
monitors in your new fuel storage area since issuance of your operating license in 1977.
Although the NRC had previously granted Davis-Besse an exemption from this requirement as
part of your prior license to possess special nuclear material, that exemption was not
transferred to your current operating license.
The third violation involved the recent identification that original engineering design
calculations prepared to support the design and operation of the control room emergency
ventilation system were inadequate. As discussed in detailin Section E1.1 of the inspection
report, Davis-Besse personnel identified this condition, which was not likely to be discovered
as the result of routine surveillance or quality assurance activities, and took
prompt and comprehensive corrective action. In accordance with the provisions of
Section Vll.B.3 of NUREG-1600, " General Statement of Policy and Procedures for NRC
Enforcement Actions," and after consultation with the Director, Office of Enforcement, I
9703050194 970225
ADOCK 05000346
[
G
5.UElfps.u.EM
J
_
.
-
-
-
.
--
.-
-
-
-
.
J. K. Wood
-2-
.
I have been authorized to exercise enforcement discretion in this case and not issue a Notice
of Violation for this violation.
However, the first two violations are cited in.the enclosed Notice of Violation, and the
'
circumstances surrounding the violations are described in detailin the enclosed report. Please
,
note that you are required to respond to this letter and should follow the instructions specified
'
in the enclosed Notice when preparing your response. The NRC will use your response,in
.
part, to determine whether further enforcement action is necessary to ensure compliance with
{
regulatory requirements.
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. A. Grobe for
James L. Caldwell, Director
Division of Reactor Projects
Docket No.: 50-346
License No.: NPF-3
Enclosures:
inspection Report 50-346/96014
cc w/ encl:
John P. Stetz, Senior Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager Regulatory Affairs
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C. A. Glazer, State of Ohio, Public Utilities Commission
,
Distribution:
Docket File w/enct
TSS w/enci
DRS (3) w/ encl
PUBLIC lE-01 w/enci
DRP w/ encl
J. Lieberman, OE w/enci
OC/LFDCD w/enci
SRI Davis-Besse w/ encl
J. Goldberg, OGC w/ encl
Project Manager, NRR w/enci
A. B. Beach, w/ encl
R. Zimmerman, NRR w/enct
Rlli Enf. Coordinator, w/enci
W. L. Axelson, w/enci
CAA1 w/enci (E-mail)
Rl!I PRR w/ encl
DOCUMENT NAME: R:\\lNsPRPTs\\ POWERS \\DAVi\\DAV96o14.DRP
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E' = Copy with attach /enci
4
'N" = No copy
/s/
,
)
OFFICE
Ritt
'
Rill
Rill /oE
Rlli
'6
Rill
NAME
Sch
binz
Korakg E1.1
Clayton/
Jacobso N
C Id
-
T
w\\
Lieberman4
DATE
2/4 97
2A497
2[f97
29097
l 2/
7
_
OFFICutL RECORD COPY
5 \\Y
,
LMw V / ti
s
3
LAh
Co Mm I-2(Adth En.l/14tmpy
3