ML20135D361
| ML20135D361 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/02/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mueller J COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20135D365 | List: |
| References | |
| NUDOCS 9612090351 | |
| Download: ML20135D361 (3) | |
See also: IR 05000295/1996018
Text
'
.
.
.
December 2, 1996
Mr. J. H. Mueller
Site Vice President
Zion Station
Commonwealth Edison Company
101 Shiloh Boulevard
Zion, IL 60099
SUBJECT:
NRC INSPECTION REPORTS NO. 50-295/96018(DRS); 50-304/96018(DRS)
Dear Mr. Mueller:
On November 1, 1996, the NRC completed an inspection at your Zion 1 and 2
reactor facilities. The enclosed report presents the results of that
inspection.
During the one week inspection period, we found your safeguards program to be
satisfactory to protect public health and safety.
However, we noted that
continuing security staff shortages required the use of extensive overtime to
meet requirements despite your efforts during the past year.
The staffing
shortage negatively affected the capability of your security training staff to
conduct response team drills. The performance of response personnel in actual
drills observed by the NRC during the Operational Safeguards Response
Evaluation in August 1996 indicated weaknesses in the execution of your
protection strategy that we attributed to training.
No violations of NRC requirements were identified during this inspection.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(E).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of
this inspection will not be placed in the NRC Public Document Room.
N
l
i
9612090351 961202
ADOCK 05000295
G
.
0900W
. .
.
.
'
.
S
J. H. Mueller
-2-
December 2, 1996
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket Nos. 50-295; 50-304
Enclosure:
Inspection Reports No.
50-295/96018(DRS);
50-304/96018(DRS)
(SAFEGUARDS INFORMATION)
cc w/ encl:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear Operating Officer
G. K. Schwartz, Station Manager
W. Stone, Regulatory Assurance Supervisor
I. Johnson, Acting Nuclear
Regulatory Services Manager
NRR/DRIS/RSGB9D
NMSS/HIGDON/4E4
OE Director
cc w/ encl w/o
SAFEGUARDS INFORMATION: Document Control Desk - Licensing
Richard Hubbard
Nathan Schloss, Economist,
Office of the Attorney General
Mayor, City of Zion
State Liaison Officer, Wisconsin
State Liaison Officer
Chairman, Illinois Commerce Commission
Distribution:
.
Docket File w/o encl
SRIs, Zion, Braidwood,
Enf. Coordinator, RIII w/o encl
PUBLIC IE-04 w/o encl
Byron w/o encl
RACl w/o encl (E-mail)
OC/LFDCB w/o enci
CAAl w/o encl (E-mail)
G. E. Grant, RIII w/o encl
DRP w/o encl
LPM, NRR w/o encl
W. L. Axelson, RIII w/o encl
RIII PRR w/o encl
DRS w/o encl
A. 3. Beach, RIII w/o encl
DOCUMENT NAME:
B:ZIO96018.DRS
(SEE ATTACHED CONCURRENCE)
To receive a copy of this document, indicate in the bon: "C" = Copy without attschment/ enclosure
"E" = Copy wit
"N" = No copy
OFFICE
RIII
RIII
l
RIII
l
RIII
gc.
l
NAME
JBelanger:jp
JCreed
MDapas
BClayton/GGrant
'
DATE
12/
/96
12/
/96
12/
/96
12/ 2 /96
0FFICIAL RECORD COPY
S
.
.
l
Mr. J. H. Mueller
Site Vice President
Zion Station
Commonwealth Edison Company
101 Shiloh Boulevard
Zion, IL 60099
SUBJECT:
NRC INSPECTION REPORTS NO. 50-295/96018(DRS); 50-304/96018(DRS)
Dear Mr. Mueller:
[
On November 1,1996, the NRC completed an inspection at your Zion 1 and 2
reactor facilities. The enclosed report presents the results of that
inspection.
During the one week inspection period, we found your safeguards program to be
satisfactory to protect public health and safety.
However, we noted that
continuing security staff shortages required the use of extensive overtime to
meet requirements despite your efforts during the past year.
The staffing
shortage negatively affected the capability of your security training staff to
conduct response team drills.
No violations of NRC requirements were identified during this inspection.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
i
,
Section 73.21(c)(2).
This information must be handled and protected in
i
accordance with the provisions of 10 CFR 73.21.
Consequently, our report of
this inspection will not be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket Nos. 50-295; 50-304
'
Enclosure:
Inspection Reports No.
i
50-295/96018(DRS);
50-304/96018(DRS)
(SAFEGUARDS INFORMATION)
DOCUMENT NAME:
B:ZIO96018.DRS
To recorve a wpy of this document, indicato in the box: "C" = Copy without attachment / enclosure T = Copy with
attachment / enclosure
"N" = No copy
0FFICE
RIII
6 RIII _ f . ld RIII
___
jB RIII
l
,,
NAME
JBelangt@fjp
JCreedN >'
MDapaV//M
BClayton/GGrant
DATE
11//e/ /96
11/ d\\ [96
11/.2 6/9'6
11/
/96
0FFlCIAL RECORD COPY
^
S