Forwards Insp Repts 50-295/96-18 & 50-304/96-18 on 961028- 1101.No Violations Noted
ML20135D361
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/02/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20135D365 List:
References
NUDOCS 9612090351
Download: ML20135D361 (3)


See also: IR 05000295/1996018

Text

'

.

.

.

December 2, 1996

Mr. J. H. Mueller

Site Vice President

Zion Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC INSPECTION REPORTS NO. 50-295/96018(DRS); 50-304/96018(DRS)

Dear Mr. Mueller:

On November 1, 1996, the NRC completed an inspection at your Zion 1 and 2

reactor facilities. The enclosed report presents the results of that

inspection.

During the one week inspection period, we found your safeguards program to be

satisfactory to protect public health and safety. However, we noted that

continuing security staff shortages required the use of extensive overtime to

meet requirements despite your efforts during the past year. The staffing

shortage negatively affected the capability of your security training staff to

conduct response team drills. The performance of response personnel in actual

drills observed by the NRC during the Operational Safeguards Response

Evaluation in August 1996 indicated weaknesses in the execution of your

protection strategy that we attributed to training.

No violations of NRC requirements were identified during this inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(E). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

N

l

i

9612090351 961202

PDR ADOCK 05000295

G PDR .

0900W

'

.

S

J. H. Mueller -2- December 2, 1996

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Nos. 50-295; 50-304

Licenses No. DPR-39; DPR-48

Enclosure: Inspection Reports No.

50-295/96018(DRS);

50-304/96018(DRS)

(SAFEGUARDS INFORMATION)

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

NRR/DRIS/RSGB9D

NMSS/HIGDON/4E4 l

OE Director

cc w/ encl w/o l

SAFEGUARDS INFORMATION: Document Control Desk - Licensing l

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution: .

l

Docket File w/o encl SRIs, Zion, Braidwood, Enf. Coordinator, RIII w/o encl

PUBLIC IE-04 w/o encl Byron w/o encl RACl w/o encl (E-mail) l

OC/LFDCB w/o enci CAAl w/o encl (E-mail) G. E. Grant, RIII w/o encl l

DRP w/o encl LPM, NRR w/o encl W. L. Axelson, RIII w/o encl

RIII PRR w/o encl DRS w/o encl A. 3. Beach, RIII w/o encl

DOCUMENT NAME: B:ZIO96018.DRS (SEE ATTACHED CONCURRENCE)

To receive a copy of this document, indicate in the bon: "C" = Copy without attschment/ enclosure "E" = Copy wit

"N" = No copy l

OFFICE RIII RIII l RIII l RIII gc. l

NAME JBelanger:jp JCreed MDapas BClayton/GGrant i

'

DATE 12/ /96 12/ /96 12/ /96 12/ 2 /96

0FFICIAL RECORD COPY

S

l

.

.

SA

Mr. J. H. Mueller

l Site Vice President

Zion Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC INSPECTION REPORTS NO. 50-295/96018(DRS); 50-304/96018(DRS)

Dear Mr. Mueller:

[ On November 1,1996, the NRC completed an inspection at your Zion 1 and 2

reactor facilities. The enclosed report presents the results of that

inspection.

During the one week inspection period, we found your safeguards program to be

satisfactory to protect public health and safety. However, we noted that

continuing security staff shortages required the use of extensive overtime to

meet requirements despite your efforts during the past year. The staffing I

shortage negatively affected the capability of your security training staff to  !

conduct response team drills.

No violations of NRC requirements were identified during this inspection.

Areas examined during this inspection concern a subject matter which is exempt ,

from disclosure according to Part 73, Title 10, Code of Federal Regulations, i

Section 73.21(c)(2). This information must be handled and protected in i

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room. l

l

We will gladly discuss any questions you have concerning this inspection.

Sincerely, I

Geoffrey E. Grant, Director l

Division of Reactor Safety l

l

'

Docket Nos. 50-295; 50-304

Licenses No. DPR-39; DPR-48

Enclosure: Inspection Reports No. i

50-295/96018(DRS); I

50-304/96018(DRS)

(SAFEGUARDS INFORMATION)

DOCUMENT NAME: B:ZIO96018.DRS

To recorve a wpy of this document, indicato in the box: "C" = Copy without attachment / enclosure T = Copy with  !

attachment / enclosure "N" = No copy

0FFICE RIII ,, 6 RIII _ f . ld RIII ___

jB RIII l

NAME JBelangt@fjp JCreedN >' MDapaV//M BClayton/GGrant

DATE 11//e/ /96 11/ d\ [96 11/.2 6/9'6 11/

^

/96 1

0FFlCIAL RECORD COPY

S