Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000285/1996011 + (ML20134L978)
- ML20134L979 + (ML20134L979)
- 05000266/LER-1985-005, :on 850726,during QA Audit of Spent Fuel Pool Records,Three Spent Fuel Assemblies Subcritical for Less than 1 Yr Stored Next to East Spent Fuel Pool Wall.Gamma Heating Effects Calculations Performed + (ML20134L980)
- ML20134L981 + (ML20134L981)
- ML20134L982 + (ML20134L982)
- ML20134L983 + (ML20134L983)
- 05000267/LER-1985-011, :on 850722,Loop 1 Shutdown Initiated by Plant Protective Sys on Loss of Bearing Water.Caused by Mistaken Operation of Bearing Water Surge Tank Level Controller on Loop 1 Bearing Water Surge Tank + (ML20134L984)
- ML20134L985 + (ML20134L985)
- 3F0297-08, Monthly Operating Rept for Jan 1997 for Crystal River Unit 3 + (ML20134L986)
- 05000295/LER-1985-027-04, :on 850726,Procedure CRN-85-357 Re Backfill Feedwater Instrument Sensing Lines Incorrectly Approved. Caused by Employee Error.Procedure Subsequently Approved W/Proper Signatures + (ML20134L987)
- ML20134L989 + (ML20134L989)
- ML20134L990 + (ML20134L990)
- 05000341/LER-1985-043, :on 850724,Div 1 Core Spray Mode Inoperable Due to Deenergization of RCIC Room Cooler T41-B021. Caused by Cooler Room Control Switch in Off Position. Cooler Returned to Normal + (ML20134L991)
- 05000327/LER-1985-031-01, :on 850729,auxiliary Bldg Isolation Occurred Due to High Radiation Indicated by Stack Ventilation Monitor.Caused by Leaking Weld at Sample Line Connection Upstream of Valve 62-674.Lines Replaced + (ML20134L992)
- ML20134L993 + (ML20134L993)
- ML20134L994 + (ML20134L994)
- ML20134L995 + (ML20134L995)
- 05000482/LER-1985-056, :on 850728,control Room Ventilation Isolation Occurred Due to High Chlorine Signal from Chlorine Monitor. Caused by Discoloration on chlorine-sensitive Paper Tape. Tape Replaced & Monitor Recalibr + (ML20134L996)
- ML20134L997 + (ML20134L997)
- ML20134L998 + (ML20134L998)
- 05000296/LER-1985-021-02, :on 850730,inadvertent Containment Isolation Occurred Due to Fuse Pulled to Deenergize Valve Circuit to Perform Mod.Caused by Mod Instructions & Tagout Request Not Adequately Addressing All Expected Events + (ML20134L999)
- 3F0297-14, Informs That CM Smith,Licesne OP-21015,Docket 55-21858,has Changed Her Name to CM Mckim + (ML20134M000)
- ML20134M001 + (ML20134M001)
- ML20134M002 + (ML20134M002)
- 05000482/LER-1996-012, :on 961018,determined That TS Clarification (TSC) 004-86 Was Inappropiate to Circumstances.Cause Indeterminate.Deleted & Removed TSC 004-86 from Control Room Required Reading + (ML20134M003)
- ML20134M004 + (ML20134M004)
- ML20134M006 + (ML20134M006)
- ML20134M007 + (ML20134M007)
- B16232, Provides Response to RAI Re Proposed Third Party Oversight of Comprehensive Plan for Reviewing & Dispositioning Safety Concerns Raised by Employees + (ML20134M008)
- ML20134M009 + (ML20134M009)
- ML20134M010 + (ML20134M010)
- RBG-43328, Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 2 + (ML20134M011)
- ML20134M013 + (ML20134M013)
- ML20134M014 + (ML20134M014)
- ML20134M015 + (ML20134M015)
- ML20134M016 + (ML20134M016)
- ML20134M017 + (ML20134M017)
- ML20134M018 + (ML20134M018)
- ML20134M019 + (ML20134M019)
- ML20134M020 + (ML20134M020)
- U-600239, Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept + (ML20134M021)
- ML20134M023 + (ML20134M023)
- BSEP-97-0069, Identifies Five Major Issues as Result of Util Review & Addl Independent Reviews by NRC Re CREVS + (ML20134M025)
- ML20134M027 + (ML20134M027)
- NRC-96-0116, Submits 10-day Followup Rept Describing Results of Confirmatory Test & Insp Items,As Well as Closeout Summary for Util Response to NRC Bulletin 95-002 + (ML20134M028)
- ML20134M030 + (ML20134M030)
- BSEP-97-0039, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (ML20134M032)
- ML20134M033 + (ML20134M033)
- ML20134M034 + (ML20134M034)
- ML20134M036 + (ML20134M036)
- 2CAN029701, Responds to RAI Re TS Change on Extension of PPS Surveillance Test Interval to 123 Days + (ML20134M037)