ML20134M007

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Monthly Operating Rept for June 1985 & Rev 1 to Monthly Operating Rept for Jul 1985
ML20134M007
Person / Time
Site: Calvert Cliffs 
Issue date: 08/23/1985
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20134M010 List:
References
NUDOCS 8509030504
Download: ML20134M007 (1)


Text

-

B ALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 1475 D A LTIM OR E, M A R Y L A N D 21203

, ",, fl5 "

" " ^ ^ " '

August 23,1985 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20055 Attention:

Document Control Desk

Subject:

Revision to June and July Operating Data Reports for Calvert Cliffs Unit 2 (Docket 50-318)

Gentlemen:

The subject reports were sent to you by cover letters, dated July 16 and August 12, 1985.

It has been ascertained that an error was made calculating the Gross Electrical Energy Generated (line 17) for the month of June. Will you, therefore, replace with the enclosed copics; the corrections are highlighted in bold.

Thank you for your cooperation, and if there are any questions concerning these revisions, please contact Bob Porter (301)-260-4747.

Sincerely, M

L.B.Ru/

ssell Plant Superintendent LBil/djw Attachments:

Unit 2 Operating Data Reports for June and July,1985 Copics:

11. F. Ash (BG&E)

P. A. Pieringer (BG&E)

M. Ileebe (N RC)

D. Reilly (INPO)

E. K. llewley (BG&E)

P. Ross (N RC)

T. Foley (N RC)

T. E. Ruszin, Jr. (IIG&E)

K. Gibbard (DOE)

P. D. Sierer, Jr. (BG&E)

A. E. Lundynll, Jr.(BG&E)

J. A. Tiernan (BG&E)

T. Magette (DNit)

E. Wenzinger (NitC) j R.11. Mills (CE)

/7

'l eao90%$ck e

8

-.