y ov(L j
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.
- 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN ECLEAR August 20, 1985 PY-CEI/OIE 0103 L Mr. James G. Keppler Regional Administrator, Region III office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Drywell Vacuum Relief Isolation Valves
[RDC 141(85)]
Dear Mr. Keppler:
As stated in our interim report on this subject dated July 25, 1985, we are submitting this letter to advise you of our progress relative to Deviation Analysis Report 245.
We have completed our evaluation of this deficiency.
It has been determined that an isolation logic changa is necessary and this design change is in progress.
We will file our next report upon completion of the design change.
Please call if there are any additional questions.
Sincerely,
[
4 Murr
. Edelman Vice President Nuclear Group MRE:sab
$[ SNEK 0 0
s AUG 2 21985, I, 3 47 a
- Mr. Jamen G. Ksppler August 29, 1985 1
PY-CEI/OIE 0103 L cc:
Mr. J. A. Grobe USNRC, Site Office (SBB50)
Mr. D. E. Keating USNRC, Site Office (SBB59)
Director Office of Inspection and Enforcement U.S.- Nuclear Regulatory Commission Washington, D.C.
20555 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
-