ML20134M018
| ML20134M018 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/30/1985 |
| From: | Porter R BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20134M010 | List: |
| References | |
| NUDOCS 8509030509 | |
| Download: ML20134M018 (1) | |
Text
. _ _.
OPERATING DATA REPORT Docket No. 50-318 Date: 07-16-85 Completed by R. Porter i
Telephone: (301) 260-4747 OPERATING STATUS eseessessessessesse 1.
Unit Name:
Calvert Cliffs No. 2 2.
Reporting Period:
June 1985 3.
Licensed Thermal Power (MWT):
2,700 4.
Nameplate Rating (gross MWe):
911 5,
Design Electrical Rating (Net MWE):
845 6.
Maximum Dependable Capacity Gross MWe:
860 7.
Maximum Dependable Capacity (Net MWe):
825 8.
Change In Capacity Ratings:
None 9.
Power Level To Which Restricted (Net MW):
NA 10.
Reasons For Restrictions:
NA This Month Yr-To-Date Cumulative 11.
Ilours In Reporting Period 720.0 4,343 72,311 12.
Number Of Ilours Reactor Was Critical 720.0 3,974.1 60,532.9 13.
Reactor Reserve Shutdown IIours 0.0 0.0 968.0 14, llours Generator On-line 720.0 3,958.6 59,577.9 15, Unit Reserve Shutdown flours 0.0 0.0 0.0 16, Gross Thermal Energy Generated (MWil) 1,928,335 10,500,618 149,221,555 17.
Gross Electrical Energy Generated (MWil) 627,994 3,490,915 49,149,118 18, Net Electrical Energy Generated (MWil) 601,501 3,339,544 46,881,752 19, Unit Service Factor 100.0 91.1 82.4 20, Unit Availability Factor 100.0 91.1 82.4 21.
Unit Capacity Factor (Using MDC Net) 101.3 93.2 78.9 22.
Unit Capacity Factor (Using DER Net) 98.9 91.0 76.7 23, Unit Forced Outage Rate 0.0 8.9 6.4 24, Shutdowns Scheduled Over the Next Six Months (type, date, and duration): Sixth Scheduled Refueling, October 19,1985 to December 22,1985 25, if Shutdown At End Of Report Period, Estimated Date Of Startup: N/A 8509030509 050823 DR ADOCK 050 0
Revision 2
,