Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133H351 + (ML20133H351)
- ML20133H352 + (ML20133H352)
- ML20133H353 + (ML20133H353)
- ML20133H355 + (ML20133H355)
- ML20133H358 + (ML20133H358)
- ML20133H359 + (ML20133H359)
- 05000361/LER-1985-037, :on 850707,while Troubleshooting Spurious Noise Problems,Control Room Isolation Sys Train B Actuated.Caused by Failure of Alarm Defeat Circuit in Test Module Used in Radiation Monitor 2/3RE-7825B + (ML20133H360)
- ML20133H361 + (ML20133H361)
- ML20133H362 + (ML20133H362)
- ML20133H364 + (ML20133H364)
- ML20133H365 + (ML20133H365)
- ML20133H366 + (ML20133H366)
- A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid + (ML20133H367)
- 05000250/LER-1985-026, :on 850911,boric Acid Storage Tank a Found W/ Concentration of 22,800 Parts Per Million.Caused by Batch of Boron Added to Tank a Earlier in Day.Tank B Lined Up to Unit 3 & 200 Gallons of Water Added to Tank a + (ML20133H369)
- ML20133H371 + (ML20133H371)
- 05000220/LER-1985-015, :on 850911,personnel Informed of Three Instances of Cable Routing Discrepancies.Operators Informed. Mods Designed & Will Be Installed in Timely Manner + (ML20133H372)
- ML20133H373 + (ML20133H373)
- ML20133H375 + (ML20133H375)
- ML20133H376 + (ML20133H376)
- ML20133H378 + (ML20133H378)
- ML20133H380 + (ML20133H380)
- ML20133H381 + (ML20133H381)
- ML20133H382 + (ML20133H382)
- ML20133H383 + (ML20133H383)
- ML20133H384 + (ML20133H384)
- ML20133H385 + (ML20133H385)
- 05000278/LER-1985-011, :on 850621,discovered That Fire Watch Not Established for Fire Barriers Between MSIV Room & Torus Room,Per Tech Specs.Caused by Error in Design Drawings & Personnel Oversight.All Drawings Reviewed + (ML20133H386)
- ML20133H388 + (ML20133H388)
- ML20133H391 + (ML20133H391)
- ML20133H393 + (ML20133H393)
- ML20133H394 + (ML20133H394)
- ML20133H395 + (ML20133H395)
- IR 05000730/2008002 + (ML20133H396)
- ML20133H397 + (ML20133H397)
- ML20133H398 + (ML20133H398)
- IR 05000701/2008018 + (ML20133H399)
- ML20133H400 + (ML20133H400)
- ML20133H401 + (ML20133H401)
- IR 05000219/1985023 + (ML20133H402)
- ML20133H405 + (ML20133H405)
- IR 05000930/2010001 + (ML20133H406)
- ML20133H408 + (ML20133H408)
- ML20133H409 + (ML20133H409)
- ML20133H410 + (ML20133H410)
- ML20133H411 + (ML20133H411)
- ML20133H413 + (ML20133H413)
- ML20133H414 + (ML20133H414)
- ML20133H415 + (ML20133H415)
- RBG-22303, Submits Weekly Status Rept Identifying License Conditions & Other Commitments Completed During Previous Wk & Cumulatively Since Issuance of Low Power License.Cummulative Listing & Commitments Encl + (ML20133H416)
- ML20133H417 + (ML20133H417)
- ML20133H418 + (ML20133H418)