| ML20133H410 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/05/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20133H413 | List: |
| References | |
| NUDOCS 8508090343 | |
| Download: ML20133H410 (2) | |
See also: IR 05000348/1985027
Text
ei
Olhu&
n .-
JUL 0 51985
flabamaPowerCompany
/ ATTN:
Mr. R. P. Mcdonald
Senior Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT:
REPORT NOS. 50-348/85-27 AND 50-364/85-27
On June 17-20, 1985, NRC inspected activities authorized by NRC Operating License
Nos. NPF-2 and NPF-8 for your Farl@y facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations of activities
in progress.
The inspector also conducted independent measurements, in the
Region II Mobile Laboratory at your site, to verify your capability for analyzing
radioactive effluents and to establish and maintain standardized methodology
among regulated facilities and the NRC.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part ?,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC's Public Decument Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
i
l
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-348/85-27
and 50-364/85-27
cc w/ enc 1:
(See page 2)
i
i
8500090343 850705
i
ADOCK 05000348
Qp
G
I \\
l
!
L
- _ .
-
_
_
_
'
.
. , ,
Alabama Power Company
2
cc w/ encl:
/W. O. Whitt, Executive Vice President
v0. D. Woodard, Plant Manager
J. G. Hairston, III, Manager, Nuclear Engineering
1
and Technical Support
J.W.McGowan, Manager-SafetyAudit
and Engineering Review
dH.O. Thrash, Manager,NuclearOperations
M.andAdministration
G. Ware, Supervisor-Safety Audit
and Engineering Review
bcc w/ encl:
RC Resident Inspector
E. Reeves, Project Manager, NRR
Doto ant Control Desk
State of Alabama
f
1
RII
RII
g
RII
R
l
pt GBKuzo:dr
DMontgomery
Co lins
WRuland
FCantrell
4 /o /85
A/g /85
/85
7A/ /85
7//f, /85
s
Macs"
-s