Forwards Insp Repts 50-348/85-27 & 50-364/85-27 on 850617-20.No Violations or Deviations Identified
ML20133H410
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/05/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20133H413 List:
References
NUDOCS 8508090343
Download: ML20133H410 (2)


See also: IR 05000348/1985027

Text

ei

Olhu&

n .-

JUL 0 51985

flabamaPowerCompany

/ ATTN:

Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT:

REPORT NOS. 50-348/85-27 AND 50-364/85-27

On June 17-20, 1985, NRC inspected activities authorized by NRC Operating License

Nos. NPF-2 and NPF-8 for your Farl@y facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations of activities

in progress.

The inspector also conducted independent measurements, in the

Region II Mobile Laboratory at your site, to verify your capability for analyzing

radioactive effluents and to establish and maintain standardized methodology

among regulated facilities and the NRC.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part ?,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC's Public Decument Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

i

l

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/85-27

and 50-364/85-27

cc w/ enc 1:

(See page 2)

i

i

8500090343 850705

i

PDR

ADOCK 05000348

Qp

G

PDR

I \\

l

!

L

- _ .

-

_

_

_

'

.

. , ,

Alabama Power Company

2

cc w/ encl:

/W. O. Whitt, Executive Vice President

v0. D. Woodard, Plant Manager

J. G. Hairston, III, Manager, Nuclear Engineering

1

and Technical Support

J.W.McGowan, Manager-SafetyAudit

and Engineering Review

dH.O. Thrash, Manager,NuclearOperations

M.andAdministration

G. Ware, Supervisor-Safety Audit

and Engineering Review

bcc w/ encl:

RC Resident Inspector

E. Reeves, Project Manager, NRR

Doto ant Control Desk

State of Alabama

f

1

RII

RII

g

RII

R

l

pt GBKuzo:dr

DMontgomery

Co lins

WRuland

FCantrell

4 /o /85

A/g /85

/85

7A/ /85

7//f, /85

s

Macs"

-s