Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133H240 + (ML20133H240)
- ML20133H241 + (ML20133H241)
- ML20133H242 + (ML20133H242)
- ML20133H244 + (ML20133H244)
- ML20133H246 + (ML20133H246)
- ML20133H248 + (ML20133H248)
- ML20133H249 + (ML20133H249)
- ML20133H252 + (ML20133H252)
- RA-96-0226, Notification of Forthcoming Shipment of Radioactive Matl in IF-300 Series Shipping Casks,To New Hill,Nc + (ML20133H255)
- ML20133H257 + (ML20133H257)
- ML20133H258 + (ML20133H258)
- ML20133H261 + (ML20133H261)
- ML20133H262 + (ML20133H262)
- ML20133H264 + (ML20133H264)
- ML20133H265 + (ML20133H265)
- ML20133H266 + (ML20133H266)
- ML20133H268 + (ML20133H268)
- ML20133H269 + (ML20133H269)
- ML20133H271 + (ML20133H271)
- ML20133H272 + (ML20133H272)
- NSD-NRC-97-4937, Forwards Draft AP600 SSAR App 1B.Response to RAI Re Severe Accident Mitigation Design Alternatives Also Encl + (ML20133H273)
- ML20133H274 + (ML20133H274)
- ML20133H275 + (ML20133H275)
- ML20133H277 + (ML20133H277)
- ML20133H278 + (ML20133H278)
- ML20133H279 + (ML20133H279)
- ML20133H280 + (ML20133H280)
- ML20133H285 + (ML20133H285)
- ML20133H287 + (ML20133H287)
- ML20133H291 + (ML20133H291)
- PM-85-219, Monthly Operating Rept for Sept 1985 + (ML20133H293)
- ML20133H294 + (ML20133H294)
- ML20133H295 + (ML20133H295)
- ML20133H296 + (ML20133H296)
- ML20133H297 + (ML20133H297)
- ML20133H299 + (ML20133H299)
- W3P85-3218, Startup Rept for Us Nrc + (ML20133H300)
- 05000361/LER-1985-032, :on 850703,control Room Isolation Sys (EIIS Sys Code VA) Train B Actuated Due to Malfunction of Control Room Radiation Monitor 2/3 RE-7825B2.Caused by Instrument Malfunction.Monitor Rebuilt + (ML20133H302)
- ML20133H304 + (ML20133H304)
- 05000382/LER-1985-038, :on 850910,discovered That Fire Wrap for Conduits 31509C-2A & 31551R-SA Did Not Completely Cover Support Points.Cause Not Stated.Condition Existed Since Const.Points Wrapped & Operability Verified + (ML20133H305)
- ML20133H311 + (ML20133H311)
- 05000316/LER-1985-026-01, :on 850903,discovered That Charcoal Absorber Banks Inadvertently Exposed to Fire Protection Water.On 850908,determined That Absorbers Possibly Incurred Damage. Caused by Spray Header Leakage + (ML20133H312)
- 05000313/LER-1985-010-01, :on 850902,reactor Trip Resulting from Trip of Main Feedwater Pump B Occurred.Caused by Broken Speed Control Governor Drive Shaft.Governor Shaft & Drive Shaft Replaced + (ML20133H314)
- ML20133H316 + (ML20133H316)
- ML20133H317 + (ML20133H317)
- ML20133H318 + (ML20133H318)
- 05000316/LER-1985-024-01, :on 850906,automatic ESF Actuation Occurred, Resulting in Reactor Trip Signal.Caused by Simultaneous Tripping of Two of Three Steam Generator 2 Level Channel Bistables.No Corrective Action Taken + (ML20133H320)
- 05000316/LER-1985-025-01, :on 850906,discovered That Reactor Trip Instrumentation Surveillance Requirements 4.3.1.1.1,Items 18B & 20 Inadequate.Cause Not Determined.Items Added to Computerized Nuclear Test Schedule for Reactor Startup + (ML20133H323)
- ML20133H324 + (ML20133H324)
- ML20133H325 + (ML20133H325)
- ML20133H326 + (ML20133H326)