SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DCCKET NO. 50-322

, UNIT I

DATE 10/2/85 i

COMPLETED BY D. Kelly TELEPHONE (516) 929-8300 OPERATING STATUS 1.

Reporting Period: 9/85 Gross Hours in Reporting Period 0

2.

Currently Authorized Power Level (MWt):121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net):

844 3.

Power Level to which Restricted (if any) (MWe-Net): N/A 4

Reasons for Restriction (if any):

This month Yr to Date Cumulative 5.

Number of Hours Reactor wa s Critical..........

0 0

0 6.

Reac tor Rese rve Shutdown Hours................

0 0

0 7.

Hours Generator on Line.......................

0 0

0 6.

Uni t Re se rve Shut d own Hours...................

0 0

0 9.

Gros s The rmal Ene rgy Generat ed (MWH)..........

0 0

0

10. Gross Electrical Energy Generated (MWH).......

0 0

0

11. Net Electrical Energy Generated (MVH).........

0 0

0

12. Reactor Service Factor........................

N/A N/A

13. Reactor Availability Factor...................

N/A

14. Unit Service Factor...........................
15. Unit Availability Factor......................

N/A

16. Unit Capa city Factor (Us ing MDC)..............

N/A

17. Unit Capacity Factor (Using Design MWe).......

N/A

18. Unit Forced Outage Rate.......................

N/A

19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
20. If Shut Down at end of Report Period, Estimated Date of Startup:

N/A

21. Units in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 11/1/85

//6 COMMERCIAL OPERATION SPF 51 005.01-6, Rev. 6 a

l ed74 8510170003 850930 1

PDR ADOCK 05000322

/) l R

PDR

s SHOREHA'1 NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-322 I

,, UNIT DATE 10/2/85 I

COMPLETED BY D. Kelly TELEPH01.T (516) 929-8300 N0??TH ScPtember 1985 DAY AVERACE DAILY POWER LEVEL DAY AVEFACE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14' 0

30 0

15 0

31 16 0

SPF 51.fC5.f1-5, Rev. 0

=

,1 Sil0REllAM NUCLEAR POWER STATION UNIT SiluTDOWNS AND POWEK REDUCTIONS 50-322 DOCKET NO.

I UNIT NAME 10/2/85 DATE D. Kelly COMPLETED BY September 1985 REPORT MONTH METHOD OF SilUTTING DOWN TYPE F: FORCED DURATION Tile REACTOR OR NO.

DATE S: SCHEDULED (110URS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS None The heatup phase of testing for the Power Ascension Test Program has continued through the month of

SUMMARY

September. Preparations are in progress to roll the turbine.

SPF 51.995.81-7, key, g

~

F I

a r

en.~.

-~~~e~-~

gg LONG ISLAND LIGHTING COM PANY SHOREH AM NUCLE AR POWE R ST ATION = P O. BOX 628 WADING RIVE R. NEW YORK 11792 e u

,==<w %-.em o w-e rs T E L.1516) 929 8300 October 4, 1985 pM-85-219 Director, Office of Resource Management U. S.

Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

In accordance with Technical Specifications Section

6. 9.1. 8, enclosed is a

copy of the Shoreham Nuclear Power Station September Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yo~u s, q/

Q' W. E.

Steigd, Jr.

Plant Manager WES/km Enclosure cc:

Dr. Thomas Murley, Regional Administrator John Berry Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 If 1I FC 8682.2