ML20133H280

From kanterella
Jump to navigation Jump to search
Amend 126 to License DPR-49,revising Tech Specs to Incorporate Restrictions Re Overtime for Plant Operators
ML20133H280
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/10/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Corn Belt Power Cooperative, Central Iowa Power Cooperative, Iowa Electric Light & Power Co
Shared Package
ML20133H283 List:
References
DPR-49-A-126 NUDOCS 8510160345
Download: ML20133H280 (4)


Text

..

a rer

'o UNITED STATES

~g 8

NUCLEAR REGULATORY COMMISSION n

g

.t W ASHINGTON, D. C. 20555

%,...../

IOWA ELECTRIC LIGHT AND POWER COMPANY CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 126 License No. DPR 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Iowa Electric Light and Power Company, et al, dated August 31, 1984, as supplemented September 13, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will o?erate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-49 is hereby amended to read as follows:

8510160345 851010 DR ADOCK O 3 1

2-1 (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.126, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of the date of issuance.

FOR THE NUCL AR REGULATORY C0t9tISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

October 10, 1985 1

1

,_,__-.__._r__

\\

ATTACHMENT TO LICENSE AMENDMENT NO. 126 FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Revise the Appendix A Technical Specifications by removing the current page 6.8.2 and inserting the revised page 6.8.2.

The revised area is identified J

by a vertical line.

t 1

j a

'l 1

4 3

A i

i

-.. ~.

~

DAEC-1 7.

Procedures required by the Emargency Plan.

'8.

Procedures required.by the Plant Security Plan.

9.

Operation of radioactive waste systems.

10. Fire Protection Program implementation.
11. A preventative maintenance and perhdic visual examination program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient to as low as practical levels. This program shall also include provisions for performance of periodic systems leak tests of each system no less frequently than at refueling cycle intervals.

i

12. Program to ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions, including training of personnel, procedures for monitoring and a

provisions for maintenance of sampling and analysis equipment.

13. Administrative procedures for shift overtime for Operations personnel to be consistent with the Commission's June 15, 1982, policy statement.

6.8.2 Procedures described in 6.8.1 above, and changes thereto, shall be reviewed by the Operations Committee and approved by the Plant Superintendent-Nuclear prior to implementation, except as provided in 6.8.3 below.

6.8.3 Temporary minor changes to procedures described in 6.8.1 above which do not change the intent of the original procedure may be made with the concurrence of two members of the plant management staff, at least one of whom shall hold a senior operator license. Such changes shall be docunented and promptly reviewed by the Operations Committee and by the Plant Superintendent-Nuclear.

Subsequent incorporation, if necessary, as a permanent change, shall be in accord with 6.8.2 above.

Amendment No. 126 6.8-2

_ _.