Forwards LERs 85-024-00 & 85-025-00
Date released: 05/26/2020 Download: ML20133H317


:on 850906,discovered That Reactor Trip Instrumentation Surveillance Requirements 4.3.1.1.1,Items 18B & 20 Inadequate.Cause Not Determined.Items Added to Computerized Nuclear Test Schedule for Reactor Startup
ML20133H323
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/07/1985
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20133H323 (2)
:on 850906,automatic ESF Actuation Occurred, Resulting in Reactor Trip Signal.Caused by Simultaneous Tripping of Two of Three Steam Generator 2 Level Channel Bistables.No Corrective Action Taken
ML20133H320
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/07/1985
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20133H320 (2)
Forwards LERs 85-024-00 & 85-025-00
ML20133H316
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/07/1985
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20133H316 (1)