Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133E211 + (ML20133E211)
- ML20133E214 + (ML20133E214)
- ML20133E215 + (ML20133E215)
- 05000483/LER-1996-006, :on 961205,turbine Trip & Engineered Safety Features Actuations Occurred Due to B Steam Generator High Level.Turbine Generator Power Was Stabilized at 60 Mwe Until Feedwater Preheating Was Recovered + (ML20133E216)
- ML20133E218 + (ML20133E218)
- ML20133E219 + (ML20133E219)
- U-600204, Interim Deficiency Rept 55-85-06 Re Internal Wiring & Workmanship Defects in vendor-supplied safety-related Electrical Equipment.Initially Reported on 850626.Next Rept Will Be Submitted within 90 Days + (ML20133E221)
- ML20133E223 + (ML20133E223)
- RBG-21-914, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-29.Corrective Actions:Addl Samples of Welds Previously Accepted by Eight Inspectors Taken & Training Provided for Inspectors Performing Visual Weld Insps + (ML20133E224)
- ML20133E225 + (ML20133E225)
- ML20133E226 + (ML20133E226)
- ML20133E227 + (ML20133E227)
- ML20133E228 + (ML20133E228)
- ML20133E229 + (ML20133E229)
- ML20133E230 + (ML20133E230)
- PNO-III-97-002, on 970108,package Was Received from Syncor Intl Nuclear Pharmacy Which Exceeded DOT Regulatory Limits. Licensee Decontaminated Container & Used It for Return Shipment to Syncor Intl on 970109 + (ML20133E231)
- ML20133E233 + (ML20133E233)
- ML20133E234 + (ML20133E234)
- ML20133E235 + (ML20133E235)
- IR 05000341/1985033 + (ML20133E236)
- ML20133E237 + (ML20133E237)
- ML20133E238 + (ML20133E238)
- ML20133E240 + (ML20133E240)
- ML20133E241 + (ML20133E241)
- ML20133E243 + (ML20133E243)
- ML20133E245 + (ML20133E245)
- ML20133E246 + (ML20133E246)
- ML20133E247 + (ML20133E247)
- ML20133E248 + (ML20133E248)
- ML20133E250 + (ML20133E250)
- IR 05000623/2008009 + (ML20133E251)
- ML20133E252 + (ML20133E252)
- B16131, Informs of Change of Operating License Status of W Herwig, SOP-11337.License Discontinued Due to Transfer on 961217 + (ML20133E254)
- ML20133E255 + (ML20133E255)
- ML20133E257 + (ML20133E257)
- ML20133E258 + (ML20133E258)
- NUREG-0565, Forwards Topical Rept Evaluation of BAW-10092P,Rev 3 & BAW-10154 B&W Owners Group Small Break LOCA Evaluation model,CRAFT2 (Rev 3).Two Confirmatory Issues Identified. Response Requested within 45 Days of Ltr Receipt + (ML20133E259)
- ML20133E260 + (ML20133E260)
- ML20133E261 + (ML20133E261)
- ML20133E262 + (ML20133E262)
- ML20133E263 + (ML20133E263)
- ML20133E264 + (ML20133E264)
- ML20133E265 + (ML20133E265)
- ML20133E266 + (ML20133E266)
- ML20133E268 + (ML20133E268)
- ML20133E269 + (ML20133E269)
- ML20133E270 + (ML20133E270)
- ML20133E272 + (ML20133E272)
- ML20133E274 + (ML20133E274)
- U-600260, Interim Potentially Reportable Deficiency Rept 55-85-09 Re Inadequate Implementation of Design Document Review Process. Initially Reported on 850816.Investigation Plan to Determine as-built Condition of Hardware Implemented + (ML20133E275)
- ML20133E277 + (ML20133E277)