Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B890 + (ML20132B890)
- ML20132B891 + (ML20132B891)
- RBG-22-146, Application for Amend to License NPF-40,revising Tech Specs to Increase Rated Steady State Voltage from 115% to 130% During HPCS Diesel Generator Surveillance Tests.Fee Paid + (ML20132B892)
- ML20132B893 + (ML20132B893)
- ML20132B894 + (ML20132B894)
- 05000352/LER-1985-063, :on 850712,during Cold Shutdown,Esf Actuation Occurred.Caused by Broken Sample Tape of Chlorine Analyzer C (AE-78-016C) Due to Design Defect.Tape Repaired.Analyzer Tested & Returned to Svc + (ML20132B895)
- LIC-96-0194, Submits SG Tube Plugging Rept for Plant.Specific Details in Regard to SG Tube Plugging Will Be Provided in Six Month Rept Required by TS 3.17(5)(ii) + (ML20132B896)
- ML20132B897 + (ML20132B897)
- ML20132B900 + (ML20132B900)
- ML20132B902 + (ML20132B902)
- ML20132B903 + (ML20132B903)
- ML20132B905 + (ML20132B905)
- ML20132B907 + (ML20132B907)
- ML20132B908 + (ML20132B908)
- ML20132B910 + (ML20132B910)
- ML20132B911 + (ML20132B911)
- ML20132B913 + (ML20132B913)
- ML20132B914 + (ML20132B914)
- ML20132B915 + (ML20132B915)
- ML20132B917 + (ML20132B917)
- ML20132B918 + (ML20132B918)
- ML20132B920 + (ML20132B920)
- NRC-96-0139, Monthly Operating Rept for Nov 1996 for Fermi 2 + (ML20132B921)
- ML20132B922 + (ML20132B922)
- ML20132B923 + (ML20132B923)
- ML20132B924 + (ML20132B924)
- ML20132B925 + (ML20132B925)
- RBG-21-495, Interim Deficiency Rept DR-280 Re Reliance Class RM Motors for Limitorque motor-operated Valve Actuators.Next Rept Will Be Provided by 850722 + (ML20132B926)
- ML20132B927 + (ML20132B927)
- 05000277/LER-1985-005-02, :on 850612,w/reactor Mode Switch in Refuel Position,Intermediate Range Monitor Detectors F&B of Neutron Monitoring Sys Inoperable.Caused by Deficiency in Blocking Sequence.Sequence Will Be Revised + (ML20132B928)
- ML20132B929 + (ML20132B929)
- ML20132B930 + (ML20132B930)
- BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station + (ML20132B931)
- ML20132B932 + (ML20132B932)
- ML20132B933 + (ML20132B933)
- ML20132B934 + (ML20132B934)
- ML20132B935 + (ML20132B935)
- ML20132B937 + (ML20132B937)
- ML20132B938 + (ML20132B938)
- RBG-21-497, Interim Deficiency Rept DR-308 Re Ga Co 5-volt Logic Power Supplies for Digtal Radiation Monitors.Next Rept Will Be Provided by 850719 + (ML20132B939)
- ML20132B940 + (ML20132B940)
- IR 05000259/1985008 + (ML20132B941)
- ML20132B943 + (ML20132B943)
- ML20132B944 + (ML20132B944)
- RBG-22-116, Revised Final Part 21 Rept DR-259 Re Split Terminal Blocks Mfg by Underwriters Safety Device Co.Engineering & Design Coordination Rept Initiated & Corrective Maint Procedure 1026 Changed Re Replacement of Restraints + (ML20132B945)
- ML20132B947 + (ML20132B947)
- ML20132B948 + (ML20132B948)
- ML20132B949 + (ML20132B949)
- ML20132B951 + (ML20132B951)
- ML20132B953 + (ML20132B953)
- ML20132B954 + (ML20132B954)