Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129F001 + (ML20129F001)
- ML20129F003 + (ML20129F003)
- ML20129F005 + (ML20129F005)
- U-600173, Advises That SER Confirmatory Issue 69 Re Containment Valve & Purge Operability Closed,Per Posi-Seal,Inc Analysis Recommending Use of Higher Strength body-to-bracket Matl. Operability Rept Re Clow Corp Valves Anticipated by 850802 + (ML20129F007)
- ML20129F009 + (ML20129F009)
- ML20129F010 + (ML20129F010)
- ML20129F011 + (ML20129F011)
- VPN-061-96, Forwards Response to GL 96-04 Which Provides Basis for Adequacy of Generally Encapsulated Borafflex Currently Installed in Plant Spent Fuel Pool + (ML20129F013)
- ML20129F016 + (ML20129F016)
- ML20129F017 + (ML20129F017)
- ML20129F020 + (ML20129F020)
- ML20129F022 + (ML20129F022)
- ML20129F023 + (ML20129F023)
- ML20129F025 + (ML20129F025)
- ML20129F027 + (ML20129F027)
- NG-96-2049, Withdraws Request for Exemption from 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101 + (ML20129F028)
- 05000270/LER-1985-003-03, :on 850421,during Power Escalation,Control Rods Positioned Beyond Tech Specs Rod Position Index Limit Curve. Caused by Personnel Error.Boration of RCS Initiated. Procedures Will Be Revised + (ML20129F029)
- ML20129F032 + (ML20129F032)
- ML20129F033 + (ML20129F033)
- ML20129F034 + (ML20129F034)
- ML20129F035 + (ML20129F035)
- 0CAN099605, Informs That Effective 960912,CR Hutchinson Appointed Vice president-operations.Modification of Correspondence Distribution List,Requested + (ML20129F036)
- ML20129F037 + (ML20129F037)
- ML20129F039 + (ML20129F039)
- ML20129F040 + (ML20129F040)
- ML20129F042 + (ML20129F042)
- ML20129F044 + (ML20129F044)
- ML20129F045 + (ML20129F045)
- ML20129F047 + (ML20129F047)
- ML20129F049 + (ML20129F049)
- ML20129F052 + (ML20129F052)
- ML20129F054 + (ML20129F054)
- ML20129F055 + (ML20129F055)
- BVY-96-107, Responds to NRC Re Violations Noted in Insp Rept 50-271/96-07.Corrective Actions:Completed Addl Training of Design Engineering Staff,Completed Review of Current Design Change & Performed Engineering Evaluation + (ML20129F058)
- ML20129F059 + (ML20129F059)
- ML20129F061 + (ML20129F061)
- ML20129F062 + (ML20129F062)
- ML20129F063 + (ML20129F063)
- 05000334/LER-1985-010, :on 850506,reactor Tripped Due to lo-lo Level in Steam Generator B.Caused by Combination of Inadequate Communication Between Reactor & Turbine Operators.Event Discussed W/Appropriate Personnel + (ML20129F064)
- ML20129F065 + (ML20129F065)
- ML20129F066 + (ML20129F066)
- ML20129F068 + (ML20129F068)
- NRC-96-0085, Proposed Tech Specs 3/4.8.4 Re Electrical Equipment Protective Devices + (ML20129F069)
- ST-HL-AE-1257, First Interim Deficiency Rept Re Pipe Support eye-rod Interferences.Initially Reported on 850425.Installation Spec Changed & eye-rod Repair Initiated.Next Rept Will Be Submitted by 850816 + (ML20129F072)
- ML20129F074 + (ML20129F074)
- ML20129F076 + (ML20129F076)
- ML20129F077 + (ML20129F077)
- ML20129F078 + (ML20129F078)
- ML20129F086 + (ML20129F086)
- ML20129F089 + (ML20129F089)
- ML20129F090 + (ML20129F090)