ML20129F040
| ML20129F040 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 09/24/1996 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Graesser K COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20129F047 | List: |
| References | |
| NUDOCS 9610010237 | |
| Download: ML20129F040 (4) | |
See also: IR 05000454/1996006
Text
(
,
\\\\
e
Q
y
September 24, 1996
Mr. K. Graesser
Site Vice President
Byron Station
Commonwealth Edison Company
4450 N. German Church Road
Byron, IL 61010
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-454/455/96006
Dear Mr. Graesser:
On August 17, 1996, the NRC completed an inspection at your Byron Generating
Station. The enclosed report presents the results of that inspection.
An ineffective corrective action violation was identified during the
inspection period. We identified an open watertight door during the period.
We also found a similar door open (documented in Inspection Report
No. 96003). The corrective actions taken were ineffective in preventing a
recurrence.
Prompt identification and thorough corrective actions for
conditions adverse to quality are crucial to safe conservative operation.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the
'
enclosed report.
Please note that you are required to respond to this letter
~
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure (s) will be placed in the NRC Public Document
Room (PDR).
Sincerely,
/s/ John A. Grobe, Deputy Director, for
James L. Caldwell, Acting Director
Division of Reactor Projects
Docket Nos.
50-454; 50-455
,
Enclosures:
1.
2.
Inspection Report
No. 50-454/455/96006
0
(See attached concurrence)
9610010237 960924
l
ADOCK 05000454
G
{
l
a
,-
D
9
K. Graesser
-2-
(Distribution continued)
cc w/ enc 1:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
-
Operating Officer
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
,
Supervisor
I. Johnson, Acting Nuclear
Regulatory Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer, Wisconsin
State Liaison Officer
Chairman, Illinois Commerce Commission
Document Control Desk-Licensing
Docket File w/ encl
DRP w/ encl
OC/LFDCB w/ encl
RIII PRR w/ encl
SRI Byron, Braidwood, Zion w/ encl
PUBLIC IE-01 w/ encl
Project Manager, NRR w/ encl
CAA1 w/enci (E-mail)
A. B. Beach, w/ encl
RACI (E-Mail) w/ enc 1
B. L. Burgess, w/ encl
W. L. Axelson, w/ encl
g
.. .
,.<ini. 9
.. wi.....\\.byro\\.byr96006.drp
Document: R:\\Insprpts\\ powers
.
-c - c.,, .i s . .
..nf.- i r - c.,,, . s m . ..../.-i
-
0FFICE
RIlh_k.
RIII )
b RIlld
,
NAME
LandNab
Mill /rb
GrN/Caldwell
I
DATE
09///96
09/[l/96
0/9 f\\/96
'
0FFICIAL RECORD COPY
i
.
-
-
.
n,
--.
'
,
d,pA "%,'$
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
y
$
%
REGION 111
5
!
801 WARRENVILLE ROAD
f
USLE, ILUNOIS 60532-4351
4....
September 24, 1996
Mr. K. Graesser
Site Vice President
Byron Station
comonwealth Edison Company
4450 N. German Church Road
Byron, IL 61010
SUBJECT:
NRC INTEGRATED' INSPECTION REPORT 50-454/455/96006
Dear Mr. Graesser:
On August 17,.1996, the NRC completed an inspection at your Byron Generating
Station. The enclosed report presents the results of that inspection.
An ineffective corrective action violation was identified during the
inspection period. We identified an open watertight door during the period.
We also found a similar door open (documented in Inspection Report
No. 96003). The corrective actions taken after the first occurrence were
ineffective in preventing a recurrence. Prompt identification and thorough
corrective actions for conditions adverse to quality are crucial to safe
conservative operation.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure (s) will be placed in the NRC Public Document
.
Room (PDR).
Sincerely,
ames L. Caldwell, Acting Director
Division of Reactor Projects
Docket Nos. 50-454; 50-455
Enclosures:
1.
2.
Inspection Report
'
No. 50-454/455/96006
(See attached concurrence)
,
.
.
-
-
-
. -
-
.-
.
. - _ -
-
-
._
.
,
T
K. Graesser
-2-
,
'
(Distribution continued)
cc w/ encl:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
'
Operating Officer
K. Kofron, Station Manager
D. Brindle, Regulatory Assurance
Supervisor
I. Johnson, Acting Nuclear
.
Regulatory Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer, Wisconsin
1
State Liaison Officer
Chairman, Illinois Commerce Commission
Document Control Desk-Licensing
4
4
4
4
M
$
I
4
a
i
i