ML20129F039

From kanterella
Jump to navigation Jump to search
Forwards Byron Unit 1 ISI Rept Cycle 7,Refueling Outage (B1R07),Apr-June 1996
ML20129F039
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/01/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129F045 List:
References
BYRON-96-5160, NUDOCS 9610040036
Download: ML20129F039 (1)


Text

l Commonwealth lilium Company

!!yron Gener.ating $tation 4 450 North German Church Road thron,11.610109791 Tel H15-2R5 4 41

, October 1,1996 LTR:

BYRON-96-5160 FILE: 3.11.0321 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit 1 inservice inspection Repart for Interval 1, Period 3, Outage 3 (B1R07)

Byron Nuclear Power Station, Unit 1 Facility Operating License PF-37 NRC Docket No. 50-454 Please find attached a report for the Byron Unit 1 Inservice Inspections performed during Cycle 7 refueling outage (B1R07) during April-June 1996. This report is being submitted in l

compliance with the requirements of Arthle IWA-6000 of Section XI of the ASME Boiler and l

Pressure Vessel Code,1983 Edition through Summer 1983 Addenda in accordance with Byron Technical Specification 4.0.5.

If there are any additional questions, please contact Marcia Lesniak, Nuclear Licensing Administrator at (630)663-6484.

Sincerely, Cil David B. Wozniak \\.)

Site Engineering Manager Byron Nuclear Power Station CBW/cb 8

Attachment cc:

A. B. Beach, NRC Regional Administrator, Rlli G. F. Dick, Jr., Byron Project Manager-NRR Sonia Burgess, Senior Resident inspector, Byron n33ggg Office of Nuclear Safety - lDNS 9610040036 961001 t

PDR ADOCK 05000454 O

PDR 1

l A tinicom Company

/