Forwards Insp Repts 50-295/96-08 & 50-304/96-08 on 960608- 0726 & NOV
ML20129F023
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/16/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20129F027 List:
References
NUDOCS 9610010233
Download: ML20129F023 (5)


See also: IR 05000295/1996008

Text

'

f

l

~]

,

l

l b

\

(

Septa ber 16, 1996 [y ]

l

l Mr. John H. Mueller

Site Vice President

l Zion Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC INTEGRATED INSPECTION REPORT

Dear Mr. Mueller:

On July 26, 1996, the NRC completed an inspection at your Zion 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection and a

requalification examination administration inspection that occurred in the

same inspection period. In addition, this report also integrates the results

of en operational performance inspection that was conducted from May 20

through 24, 1996.

During the five week period covered by this inspection, your conduct of

activities at the Zion facilities indicated a continuing trend of inattention

to detail by plant personnel. Inspectors identified that failure to follow

procedures had led to misoperation of the 2B emergency diesel generator and

licensee personnel demonstrated a lack of understanding of the operation of

the CO, portion of the fire protection system. Inspectors identified that

improper credit had been granted for maintaining active operator licenses.

Also, inspectors identified that material removed from a contaminated area was

not surveyed and packaged properly to prevent the spread of contamination.

Finally, inspectors identified that prompt corrective action was not taken to

address and correct a puncture hole in the exhaust ventilation duct from the

holdup tank room that created a potential inleakage point that was not routed

through charcoal filters.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

L)

'

\p

\ t

9610010233 960916

PDR ADOCK 05000295

hVp

s

i

J .

i

O PDR

U>-

.a

i

J. H. Mueller -2-

!

l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of  !

this letter and the enclosed inspection report will be placed in the NRC '

I Public Document Room.

1

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by John A. Grobe

Acting Deputy Director, DRP j

James L. Caldwell, Acting Director

Division of Reactor Projects

Docket Nos. 50-295

50-304

License Nos. DPR-39  ;

DRP-48 1

Enclosure: 1. Inspection Report No. 50-295/304-96008(DRP)

2. FSAR MEMO dated July 29, 1996

cc w/ enc 1: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear Regulatory

Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General i

Mayor, City of Zion  !

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

SEE ATTACHED FOR DISTRIBUT_LON O

y L y a ." C 7 m :! $ ii r iit tit *. i f . -c . c.,, . . . ..,f i c . c.,, . m ......f i .

orrtcr atit/ pan f b ,atttroopor /b A/

iemr witten M N l.tatewet N 9

mr .5h.. De,n,../

I l 0FFICIAL RECORD COPY j

l

1

)

T

l

,

J. H. Mueller -3- I

Distribution:

Docket File w/ encl Project Manager, NRR w/ encl

PUBLIC IE-01 w/ encl DRP w/ encl

OC/LFDCB w/ encl RIII PRR w/ encl

SRI Byron, Braidwood, CAA1, w/ encl (E-Mail)

. Zion w/ enc 1 W. L. Axelson, w/enci-

A. B. Beach, w/ encl .RACI (E-Mail)

S. A. Richards, Chief- . B. L. Burgess, w/ encl

Operator Licensing Branch, NRR

-

!

._ J

.- -

UNITED STATES

+gA "8%'$

g "

NUCLEAR REGULATORY COMMISSION

REGION m

5 *

801 WARRENVILLE ROAD

k, USLE, ILUNOIS 60532-4351

.....

September 16, 1996

Mr. John H. Mueller

Site Vice President

Zion Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC INTEGRATED INSPECTION REPORT

Dear Mr. Mueller:

On July 26, 1996, the NRC completed an inspection at your Zion 1 nd 2 reactor  !

facilities. The enclosed report presents the results of that inspection and a ;

requalification examination administration inspection that occurred in the i

same inspection period. In addition, this report also integrates the results

of an operational performance inspection that was conducted from May 20

through 24, 1996.

During the five wcek period covered by this inspection, your conduct of

activities at the Zion facilities indicated a continuing trend of inattention

to deta.1 by plant personnel. Inspectors identified that failure to follow

procedures had led to misoperation of the 28 emergency diesel generator and

licensee personnel demonstrated a lack of understanding of the operation of

the CO, portion of the fire protection system. Inspectors identified that

improper credit had been granted for maintaining active operator licenses.

Also, inspectors identified that material removed from a contaminated area was

not surveyed and packaged properly to prevent the spread of contamination. l

Finally, inspectors identified that prompt corrective action was not taken to '

address and correct a puncture hole in the exhaust ventilation duct from the i

holdup tank room that created a potential inleakage point that was not routed

through charcoal filters.

4

l

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter ,

1

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

I

c

l

1

l J. H. Mueller -2-

\

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

b

mes L. Caldwell, Acting Director

Division of Reactor Projects

Docket Nos. 50-295

50-304

License Nos. DPR-39 '

DPR-48

Enclosure: 1. Inspection Report No. 50-295/304-96008(DRP)

2. FSAR MEMO dated July 29, 1996

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear Regulatory

Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

Mayor, City of Zion

State liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

i

!

l