Forwards Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829 & NOV
ML20129F020
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/22/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20129F025 List:
References
NUDOCS 9610290010
Download: ML20129F020 (3)


See also: IR 05000295/1996010

Text

. - . --

.

L/ l

\  ;

h '\  !

'

October 22, 1996

i

1

i l

Mr. J. H. Mueller l

Site Vice President

Zion Station

Coranonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC INSPECTION REPORT 50-295/304/96010(DRP) l

Dear Mr. Mueller:

On August 29, 1996, the NRC completed an inspection at your Zion 1 and 2

react: 'acilities. The enclosed report presents the results of that

'

insp- ;on,

During this six-week inspection period, the Zion facilities experienced the

second occurrence this year of overflowing the OB lake discharge tank, cross-

tying the auxiliary steam and service air systems, and several other weak

operations, maintenance, and engineering practices described in the report.

Radiological work controls were adequate.

In addition, four violations of NRC requirements were identified. An

inadequate fuel handling procedure was used during new fuel assembly receipt  !

inspection, which resulted in dropping two new fuel assemblies two inches. 1

The inspectors found a scaffold that interfered with operation of safety

related equipment. In addition, a missing part from the IB centrifugal

charging pump was found during a pump inspection but the discrepancy was not l

properly documented.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

'

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

'

determine whether further enforcement action is necessary to ensure compliance

alth regulatory requirements.

One additional violation concerning the second occurrence of overflowing the

OB lake discharge tank does not require further response. Your response to

the August 23, 1996, Hotice of Violation adequately addressed this matter.

3

\,

t

9610290010 961022

[ 1/3 O , ,

l

-

.

J. Mueller -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ John A. Grobe, Deputy Director

James L. Caldwell, Acting Director

Division of Reactor Projects

Docket Nos. 50-295

50-304

License Nos. DPR-39

DPR-48

Enclosure: Inspection Report

No. 50-295/304/96010(DRP)

cc w/ encl: D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

l

l

l

(See attached continued distribution)

I

_

_ _ _ -. _ . _ _ _ _ _ _ _ _ - - - _ _

.

-

.

J. Mueller -3-

1

,

Distribution continued:

'

Docket File w/ encl Project Manager, NRR w/ enc 1

PUBLIC IE-01 w/ enc 1 DRP w/enci

OC/LFDCB w/ encl RIII PRR w/ encl

i SRI Byron, Braidwood, CAA1 w/enci (E-mail)

Zion w/ encl W. L. Axelson, w/ encl

4

A. B. Beach, w/ enc 1 RACI (E-Mail)

i B. L. Burgess, w/enci

l

!

!

!

1

l

j

,

!

!

.i

!

i

l

l

l

Document: R:\Insprpts\ powers

g .. . . , .e imi. - . ,, if. . .\. zion

. 6.\.zio96010.drp

c - c. ,, .iin .si..mi i -c - c. ,, . ism .is..mi. - i -

0FFICE RIII 7 d/ RII h d _ d

NAME Miller' h GroMaldwell "

DATE 10/}@96 /

10/22/96

0FFICIAL RECORD COPY

.

.

UNITED STATES

g.g # "%,k ,

NUCLEAR REGULATORY COMMISSION

2 g REGION til

-

1! 801 WARRENVILLE ROAD

{ ,# USLE. ILLINOIS 60532-4351

....+ October 22, 1996

_ . .

Mr. J. H. Mueller

Site Vice President

Zion Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT:

NRC INSPECTION REPORT 50-295/304/96010(DRP)

Dear Mr. Mueller:

On August 29, 1996, the NRC completed an inspection at your Zion 1 and 2

reactor facilities. The enclosed report presents the results of that

inspection.

During this six-week inspection period, the Zion facilities experienced the

second occurrence this year of overflowing the OB lake discharge tank, cross-

tying the auxiliary steam and service air systems, and several other weak

operations, maintenance, and engineering practices described in the report.

Radiological work controls were adequate.

In addition, four violations of NRC requirements were identified. An

inadequate fuel handling procedure was used during new fuel assembly receipt

inspection, which resulted in dropping two new fuel assemblies two inches.

The inspectors found a scaffold that interfered with operation of safety

related equipment. In addition, a missing part from the IB centrifugal

charging pump was found during a pump inspection but the discrepancy was not

properly documented.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when j

preparing your response. The NRC will use your response, in part, to i

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

l

One additional violation concerning the second occurrence of overflowing the

OB lake discharge tank does not require further response. Your response to

the August 23, 1996, Notice of Violation adequately addressed this matter.

l

qlplD#idDC

. . - . - . - . - - - - - - . -. - . . _ . . ..

,

'

.

,

J. Mueller -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of '

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

!

,

Sincerely,

h.

'

ames L. Caldwell, Acting Director

Division of Reactor Projects

l

Docket Nos. 50-295

50-304

License Nos. DPR-39

DPR-48

Enclosure: Inspection Report

No. 50-295/304/96010(DRP)

,

5

cc w/ encl: D. A. Sager, Vice President,

Generation Support '

H. W. Keiser, Chief Nuclear

Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General  :

Mayor, City of Zion J

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

l

l

I