ML20129F016

From kanterella
Jump to navigation Jump to search
Insp Rept 70-1113/84-16 on 841127-30 & 850114-16.Violation Noted:Failure to Investigate & Take Corrective Action in Timely Manner When Control Stds Exceeded 0.05 Control Limits.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20129F016
Person / Time
Site: 07001113
Issue date: 02/08/1985
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19304B248 List:
References
70-1113-84-16, NUDOCS 8507170181
Download: ML20129F016 (1)


Text

AMTintAt TRA?!TITTED H!RrN1TH CONWN3 2J90 trifGRV.AilON A Kto UNITED STATES o

NUCLEAR REGULATORY COMMISSION

[\\

REGloN ll

~'

n j

j 101 MARIETTA STREET, N.W.

ATLANTA, GEORGI A 30323

\\...../

Report No. 70-1113/84-16 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. 3 Licensee: General Electric Company, Nuclear Fuels Manufacturing Department Date of Inspection:

November 27-30, 1984 and January 14-16, 1985 Type of Inspection:

Unannounced Material Control and Accountability Inspector:

" O keh o 2./8/'85 J. W. Bste), Safeguards \\ Chemist {m Date Signed Approved by:

%c &lm J.,.

2/8/85 E. J. McAlpNne, Chief, haterial Control and Date Signed Accountability Section, Nuclear Materials Safety and Safeguards Branch, Division of Radiation Safety and Safeguards Inspection Summery Areas Inspected: This routine, unannounced inspection involved 50 inspector-hours by one NRC inspector in the area of measurements.

Results:

One violation was identified - failure to investigate and take corrective action in a timely manner when control standards exceeded the 0.05 control limits.

l 8507170181 850213 PDR ADOCK 07001113 C

PDR,

MATFTAL Tm? TUS mMNml

.CONTN;;5 2.WQ 1rifCRMAliON