Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000327/1985018 + (ML20128L054)
- ML20128L055 + (ML20128L055)
- ML20128L056 + (ML20128L056)
- ML20128L057 + (ML20128L057)
- PNO-I-85-051, on 850717,diesel Generator 1 Failed Monthly Surveillance Test Due to Woodward Governor Load Limit Setting Being Set at 3,instead of Normal Setting of 10. Caused by Possible Tampering W/Generator Setting + (ML20128L059)
- IR 05000369/1985015 + (ML20128L063)
- B11603, Clarifies Misinterpretations of Re Insp Rept 50-213/85-07.Ltr Discussed Measures Planned to Approve Coordination & Technical Review of Submittals to Nrc.No Specific Procedures to Fulfill Objective Implemented + (ML20128L064)
- PNO-I-85-052, on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned + (ML20128L068)
- ML20128L070 + (ML20128L070)
- ML20128L071 + (ML20128L071)
- ML20128L073 + (ML20128L073)
- ML20128L074 + (ML20128L074)
- ML20128L077 + (ML20128L077)
- ML20128L078 + (ML20128L078)
- IR 05000511/2006010 + (ML20128L079)
- IR 05000271/1985024 + (ML20128L080)
- 05000366/LER-1985-018-01, :on 850603,during Load Reduction to Take Div of Plant Svc Water Out of Svc,Turbine Trip & Subsequent Reactor Scram Received on High Moisture Separator Reheater Level Signal.Caused by High Level Trip Signal + (ML20128L085)
- ML20128L086 + (ML20128L086)
- ML20128L089 + (ML20128L089)
- ML20128L090 + (ML20128L090)
- ML20128L092 + (ML20128L092)
- ML20128L093 + (ML20128L093)
- ML20128L094 + (ML20128L094)
- ML20128L095 + (ML20128L095)
- ML20128L096 + (ML20128L096)
- ML20128L097 + (ML20128L097)
- ML20128L099 + (ML20128L099)
- ML20128L100 + (ML20128L100)
- ML20128L103 + (ML20128L103)
- ML20128L106 + (ML20128L106)
- ML20128L107 + (ML20128L107)
- ML20128L108 + (ML20128L108)
- ML20128L109 + (ML20128L109)
- ML20128L110 + (ML20128L110)
- ML20128L111 + (ML20128L111)
- ML20128L112 + (ML20128L112)
- ML20128L113 + (ML20128L113)
- ML20128L114 + (ML20128L114)
- ML20128L116 + (ML20128L116)
- ML20128L118 + (ML20128L118)
- ML20128L119 + (ML20128L119)
- ML20128L120 + (ML20128L120)
- ML20128L124 + (ML20128L124)
- ML20128L125 + (ML20128L125)
- 05000316/LER-1985-012, :on 850603,while Process Radiation Monitoring Instrumentation Inoperable,Auxiliary Bldg Ventilation Grab Sample Not Obtained within Specified Time Restraints.Caused by Personnel Error.Technicians Counseled + (ML20128L126)
- IR 05000309/1985014 + (ML20128L128)
- ML20128L129 + (ML20128L129)
- ML20128L130 + (ML20128L130)
- ML20128L133 + (ML20128L133)
- ML20128L134 + (ML20128L134)
- ML20128L135 + (ML20128L135)