Notice of Violation from Insp on 850429-0503
ML20128L107
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/10/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20128L103 List:
References
50-424-85-17, 50-425-85-17, NUDOCS 8507110243
Download: ML20128L107 (1)


See also: IR 05000429/2005003

Text

.

,

.

,

Y

\\

4

4

'

ENCLOSURE 1

'

NOTICE OF VINLATION

_

'

1

Georgia Power Company

Docket Nos. 50-424 and 50-425

Vogtle 1 and 2-

License Nos. CPPR-108 and CPPR-109

I

The following violation was identified durin.1 an inspectioniconducted on

,t?

April 29 - May 3,

1985.

The Severity Level was assigned in eccordance with

bi

the NRC Enforcement Policy (10 CFP. Part 2, Apperdix C).

cf ,

10 CFR 50, AppendixB,.Cfiterion.~VII, Control of- Purchased Material,

-

Equipment, and Servfces, states that documentary evidence that material

conforms ,to the procurement requirements shall be available at the nuclear

power plant.

Chapter 3.1.4 of Vogtle- Final Safety Analysis Report

endorses the ASME Boiler and Pressure Vessel Code,Section III. The ASME

'

Code Article NB2540 requires examination of bars by ultraronic methods.

Ceatrary to the above, the certified material test report for the lh-inch x

?/4-inch flow restrictor on Purchase Order PAV-5721, Change. Notice 90,

ourchased from Consolidated Pipe and Supply and manufactured by Stainless

'

?roducts does not contain evidence of ultrasonic inspection.-

. 31

,

This'is a 'Snerity Level IV violation (Supplement II).

)

Pursuant to 10 CFR' 2.201, you are required to submit to this office within 30

days of the date of this Notice, a written statement or explanation in reply,

includ'ag:

(1) admission ^or denial of the alleged violation; (2) the reasons

and the, violation 1'f aduitted; (3) the corrective steps which have been taken

for the

result's achieved; (4) corrective, steps which will be taken to avoid

'-

'

further' violations; and (5) the date when full compliance will be achieved.

S'ecurity

or safeguards information should be submitted as an enclosure to

/

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

~

.

or 10 CFR 73.21.

'

/