ENCLOSURE 1
'
NOTICE OF VINLATION
_
'
1
Georgia Power Company
Docket Nos. 50-424 and 50-425
Vogtle 1 and 2-
License Nos. CPPR-108 and CPPR-109
I
The following violation was identified durin.1 an inspectioniconducted on
,t?
April 29 - May 3,
1985.
The Severity Level was assigned in eccordance with
bi
the NRC Enforcement Policy (10 CFP. Part 2, Apperdix C).
cf ,
10 CFR 50, AppendixB,.Cfiterion.~VII, Control of- Purchased Material,
-
Equipment, and Servfces, states that documentary evidence that material
conforms ,to the procurement requirements shall be available at the nuclear
power plant.
Chapter 3.1.4 of Vogtle- Final Safety Analysis Report
endorses the ASME Boiler and Pressure Vessel Code,Section III. The ASME
'
Code Article NB2540 requires examination of bars by ultraronic methods.
Ceatrary to the above, the certified material test report for the lh-inch x
?/4-inch flow restrictor on Purchase Order PAV-5721, Change. Notice 90,
ourchased from Consolidated Pipe and Supply and manufactured by Stainless
'
?roducts does not contain evidence of ultrasonic inspection.-
. 31
,
This'is a 'Snerity Level IV violation (Supplement II).
)
Pursuant to 10 CFR' 2.201, you are required to submit to this office within 30
days of the date of this Notice, a written statement or explanation in reply,
includ'ag:
(1) admission ^or denial of the alleged violation; (2) the reasons
and the, violation 1'f aduitted; (3) the corrective steps which have been taken
for the
result's achieved; (4) corrective, steps which will be taken to avoid
'-
'
further' violations; and (5) the date when full compliance will be achieved.
S'ecurity
or safeguards information should be submitted as an enclosure to
/
facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
~
.
or 10 CFR 73.21.
'
/
.g
.
Dete:
June 10. 1985