ML20128L110

From kanterella
Jump to navigation Jump to search
Amend 46 to License NPF-58,revising TS Table 3.3.2-2 by Adding New Isolation Signal Setpoints & Allowable Values for Temp & delta-temp Instruments in RWCU Containment Rooms
ML20128L110
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/08/1993
From: Hall J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20128L115 List:
References
NUDOCS 9302190094
Download: ML20128L110 (4)


Text

--. _ _____- _ __ _ _ _

/

\\

UNITED $TATES I'

NUCLE AR REGULATORY COMMISSION j

.f WA$HWO TON, 0. C. M6 I

a.,.. o.e I

i THE CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL.

DOCKET NO. 50-440 PERRY NQCLEAR POWER PLANT. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LIC @il Amendment No. 46 4

License No. NPF-58 1.

The Nuclear Regulatory Commission (the Commiss. ion) has found that:

A. The application for-amendment by The Cleveland Electric Illuminating Company, Centerior Service Company, Duquesne-Light Company, Ohio Edison Com)any, Pennsylvania Power Company, and Toledo Edison Company (t w licensees) dated October 30, 1991, complies'with-the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth ir, 10 CFR L 4pter I; B.

The facility will operate-in conformity with the application, the provisions of the Act, and the rules and-regulations of the Commission; C.

There is reasonable assuranco (i) that the'ictivities authorized by-this amendment can be conducted without endangering the health.and safety of the public,_ and (ii) that such activities will be conducted in compliance witi the Commission's regulations; D,

The issuance of this amendment will not be inimical.to the-common defense and security or to the health and safety of the public; and E..The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's. regulations and all applicable-requirements have been satisfied.

4 2.

- Accordingly, the license is amended isy changes to~the Technical Specifii cations as indicated in the attachment to -this license amendment, andi paragraph 2.C.{2 amended.to read a)s follows:- 'of Facility Operating License No. NPF-58 is hereby L

l L

9302190094 930200 ADOCK 05000440 PDR -

PDR.,

Pi o

t 2-S

'(2) Inha.ical soecifications Tne Technical Specifications contained in Appendix A and the

-Environmental Protection Plan contained in Appendix B.cas revised through Amendment-No. 46 are hereby incorporated into this license.

.The Cleveland Electric. Illuminating Company shall; operate-the facility in accordance with the Technical-Specifications and the.

Environmental Protection Plan.

3.

This-license amendment is effective as of its date of: issuance.

FOR.THE NUCLEAR REGULATORY COMMISSION.

n; i

s' ames R.- Hall,-Sr. Project Manager Project Directorate'III-3 Division of Reactor Projects.III/IV/V Office of E; clear Reactor Regulatioa

Attachment:

Changes to the Technical Specificatior.!

O Date of issuance February 8,1993

=

r F

L l:

1

.4. '

s

',e

=%s y

4 4

v wwg

- _ _ ~.

6TTACHMENT T0 llCENSE AMENDMENT NO 46 FAClLITY OPERATING llCENSE NO, NPF-58 DOCKET NO. 50-440 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

The overleaf page is provided to maintain document completeness.

Remove Insert 3/4 3-18 3/4 3-18 4

o w _

TABLE 3.3.2-2 (Continued)

ISOLATION ACTUATION INSTRUMENTATION SETPOINTS o

TRIP FUNCTION TRIP SETPOINT ALLOWABLE VALUE 3.

-SECONDARY CONTAINMENT ISOLATION C5 a.

Reactor Vessel Water Level -

]

' Low, Level 2

> 129.8 inches *

> 127.6 inches b.

Drywell Pressure - High 1 1.68 psig i 1.88 psig c.

Manual Initiation M

NA 4.

REACTOR WATER CLEANUP SYSTEM ISOLATION a.

A Flow - High 1 68 gpm 1 77.1 gpm b.

a Flow Timer 1 10.0 minutes 1 10.85 minutes c.

Equipment Area Temperature - High 1.

RWCU Hx Room

< 1364 'F

< 138.9'F 2

3.

Demineralizer Valve Room,

-7135.4*F

--7 137.9'F

2. ' Pump Rooms, Valve Nest Room w

Receiving Tank Room, w-g Demineralizer Rooms 1 137.9"F i 143.7'F d.

Equipment Area a Temperature - High 1.

RWCU Hx Room

< 76.65*F

< 78.4'F 3.

Demineralizer Valve Room,

-7 28.65*F

-7 30.4*F 2.

RWCU Punip Rooms, Valv.! Nest Room Receiving Tank Room, Demineralizer Rooms 1 82.6*F 1 85.l'F g

e.

Reactor Vessel Water Level -

Low, Level 2

> 129.8 inches *

> 127.6 '9ches a

f.

Main Steam Line Tunne' Ambient g

Temperature - High

< 154.4*F

< 158.9'F g.

Main Steam Line Tunnel

~

]

.a Temperature - High

< 103.6*F

< 107.4*F g

.h.

SLCS Initiation NA NA 1.

Manual Initiation NA NA

-'