Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B343 + (ML20126B343)
- PNO-V-80-012, on 800215,notified That Shipment of 19 Wooden Boxes Received at Beatty,Nv Burial Site W/One Leaking Liquid.No Significant Contamination Detected.Box Repacked & Total Shipment Returned to Shipper + (ML20126B344)
- ML20126B345 + (ML20126B345)
- ML20126B347 + (ML20126B347)
- 05000289/LER-1981-013, Forwards LER 81-013/01T-0 Re Leaking Found in Steam Generators.Event Reportable Per Tech Spec 6.9.2.A(3). Supporting Documentation Encl + (ML20126B348)
- ML20126B349 + (ML20126B349)
- ML20126B350 + (ML20126B350)
- BVY-92-140, Forwards Amend to License DPR-28,consisting of Proposed Change Number 167,revising TS Calibration Requirements in Table 4.2.5,to Reflect That No Meaningful Calibration of Startup Range Monitor & IRM Detector Not Fully Inserted + (ML20126B351)
- ML20126B352 + (ML20126B352)
- ML20126B355 + (ML20126B355)
- ML20126B356 + (ML20126B356)
- ML20126B357 + (ML20126B357)
- ML20126B358 + (ML20126B358)
- ML20126B359 + (ML20126B359)
- ML20126B360 + (ML20126B360)
- ML20126B361 + (ML20126B361)
- ML20126B362 + (ML20126B362)
- U-600084, Confirms 850423 Telcon Re Revised Response to Question 430.135 of FSAR & to Reduce Scope of Voltage Verification Test Required on Listed Bases.Proposed Change to FSAR & Description of Easy Computer Code Encl + (ML20126B363)
- ML20126B364 + (ML20126B364)
- ML20126B366 + (ML20126B366)
- U-600066, Forwards Responses to NRC Comments on Revised SPDS (TMI Action Plan Item I.D.2) for Review.Scheduling of Design Validation Audit in mid-Oct to Support Final Closure Requested + (ML20126B367)
- ML20126B369 + (ML20126B369)
- ML20126B370 + (ML20126B370)
- A09318, Responds to Allegation RI-90-A-0225 Re Disposition of NCR 290-063 + (ML20126B371)
- ML20126B372 + (ML20126B372)
- ML20126B376 + (ML20126B376)
- IA-91-162, Forwards Details of Allegation RI-90-A-225 for Review & Followup within 30 Days of Ltr Receipt + (ML20126B378)
- ML20126B378 + (ML20126B378)
- ML20126B380 + (ML20126B380)
- ML20126B382 + (ML20126B382)
- ML20126B383 + (ML20126B383)
- ML20126B385 + (ML20126B385)
- 05000266/LER-1983-002-01, /01T-0:on 830308,emergency Diesel 3D Failed to Start During Testing.On 830309,diesel Declared out-of-svc, Then Successfully Started.Caused by Faulty Type UG8 Woodward Governor.Procedures Revised Pending Replacement + (ML20126B387)
- ML20126B390 + (ML20126B390)
- ML20126B391 + (ML20126B391)
- ML20126B393 + (ML20126B393)
- ML20126B395 + (ML20126B395)
- ML20126B397 + (ML20126B397)
- ML20126B398 + (ML20126B398)
- PNO-IV-80-009, on 800228,State of Co Will Conduct Emergency Response Exercise to Test State & Local Emergency Plans. Members of Interagency Regional Advisory Committee & Region 4 Will Observe & Critique Exercise + (ML20126B401)
- ML20126B402 + (ML20126B402)
- IR 05000213/1992020 + (ML20126B404)
- PNO-III-85-046, on 850604,while Taking Sample from Vol Control Tank,Valve Packing Failed,Resulting in Release of Approx 700 Mci Xenon & Krypton Gas.Workers Evacuated,Gas Removed by Ventilation Sys & Valve Repaired + (ML20126B405)
- ML20126B406 + (ML20126B406)
- ML20126B407 + (ML20126B407)
- ML20126B408 + (ML20126B408)
- ML20126B409 + (ML20126B409)
- ML20126B411 + (ML20126B411)
- ML20126B412 + (ML20126B412)
- ML20126B413 + (ML20126B413)
- ML20126B415 + (ML20126B415)