ML20126B393

From kanterella
Jump to navigation Jump to search
Informs That Rev 3a to Annex to Generic Generating Stations Emergency Plan Consistent w/10CFR50.54(q) Requirements & Acceptable
ML20126B393
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/09/1992
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 9212220074
Download: ML20126B393 (2)


Text

}

, Dov e

000 9B4 Dockets No. 50-456; 50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Opus West til 1400 Opus Place Downers Grove, IL 60515

Dear Mr. Reed:

This is to acknowledge receipt of Revision 3a of.Braidwood Annex to the '

Generic Generating Stations Emergency Plan (GSEP) which was transmitted by letter dated November 16, 1992.

We have reviewed the changet to the Braidwood Annex and determined that they are consistent with the requirements of 10 CFR 50.54(q) and do not decrease the effectiveness of the amergency plan. Therefore, these changes are acceptable.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions regarding this letter, please contact Ms. H.

Simons of my staff at (708) 790-5799.

Sincerely,

  • 0riginal algned by J. W. McCormick-Barter" J. W. McCormick-Barger, Chief Emergency Preparedness and Non-Power Reactor Section See Attached Distribution rglOO2O l

yes

. Rill R1 $ Rill fYI$ ll u h*??FA ber McCormick-Barger f b(

i- f<

Sirbfns/sd

- /2/9/G p IjP / A/1/4 u

9212220074 921209-U0

\

PDH ADOCK 05000456 F PDR

.- ~ , - . - . -

4 o

Commonwealth Edison Company 2 Df.C 9M Distribution ec: H. Wallace, Vice President, PWR Operations T. Kovach, Nuclear Licensing Manager A. Checca, Nuclear Licensing Administrator K. Kofron, Station Manager A. Haeger, Regulatory Assurance Supervisor DCD/DCD (RIDS)

OC/LFDCB Resident Inspectors, Byron, Braidwood, Zion D. W. Cassel, Jr., Esq.

Richard Hubbard J. W. McCaf frey, Chief, Public Utilities Division Licensing Project Mgr., NRR Robert Newmann, Office of Public Counsel, State of Illinois Center State Liaison Officer I. Johnson, CECO, Corporate Emergency Preparedne s Director D. Gonzalez, RIII D. Bement, FEMA V O.