ML20126B370
| ML20126B370 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 06/06/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 8506140083 | |
| Download: ML20126B370 (1) | |
Text
e DUKE POWER Go>mANY P.O. BOX 33189 CHARLOTTE. N.C. 28242 HAI. B. Tt:CKER m.EPHOH vaca emesseew?
(704) 373-4531 June 6, 1985 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
McGuire Nuclear Station, Unit 1 Docket No. 50-369 Gentlemen:
On May 7, 1985 it was discovered that an analog channel operational test for a source range neutron flux monitor was not performed within eight hours prior to the start of core alterations. This has been determined to be reportable under 10 CFR50.73 (a)(2)(1)(B) with the report due June 6, 1985. Due to manpower availability of the investigating group, this report will be delayed until June 21, 1985.
If there are questions, please advise Jerry Day at (704) 373-7033.
' Very truly yours, BLI n Hal B. Tucker JBD/mj f cc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region-II 101 Marietta Street, NW, Suite 2900.
Atlanta, Georgia 30323 INPO Records Center Suite 1500 1100 circle 75 Parkway l
Atlanta, Georgia 30339 M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station American Nuclear Insurers
\\r 1/
c/o Dottie Sherman, ANI Library f( f/
The Exchange, Suite 245 y
{}
270 Farmington Avenue 8506140003 850606 Farmington, CT 06032 PDR ADOCK 05000369 S