ML20126B366
| ML20126B366 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 12/15/1992 |
| From: | VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | |
| Shared Package | |
| ML20126B354 | List: |
| References | |
| NUDOCS 9212220068 | |
| Download: ML20126B366 (1) | |
Text
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
VYNPS P
TABLE 4.2.5 MINIMUM TEST AND CALIBRATION FRE00ENCIES CONTROL ROD BLOCK INSTRUMENTATION
$ib
"'E Trio Function Functional Test Calibration EO cus Startup Range Monitor N
a.
Upscale Notes 4 and 6 Note 6 l
gj@
b.
Detector Not Fully Inserted Note 6 NA OG Intermediate Range Monitor
$OG a.
Upscale Notes 4 and 6 Note 6 2'd b.
Downscale Notes 4 and 6 Note 6 f
c.
Detector Not Fully Inserted Note 6 NA Average Power Range Monitor a.
Upscale (Flow Bias)
Notes I and 4 Every Three Months b.
Downscale Notes 1 and 4 Every Three Months Rod Block Monitor a.
Upscale (Flow Bias)
Notes 1 and 4 Every Three Months b.
Downscale Notes 1 and 4 Every Three Months Trip System Logic Once/ Operating Cycle Once/ Operating Cycle (Note 3)
High Water Level in Scram Every Three Months Refueling Outage Discharge Volume Amendment No. 106 H 6 59