Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125E274 + (ML20125E274)
- PNO-I-80-001, on 800104,isolation Condenser Isolated.Addl Insps of Containment Wall in Progress.Power Operation Will Continue Per Tech Specs for 15 Days.Precedures Require Power Be Reduced to 40% 24-h After Removing Condenser from Svc + (ML20125E275)
- ML20125E276 + (ML20125E276)
- ML20125E277 + (ML20125E277)
- ML20125E279 + (ML20125E279)
- ML20125E280 + (ML20125E280)
- ML20125E281 + (ML20125E281)
- ML20125E285 + (ML20125E285)
- ML20125E287 + (ML20125E287)
- ML20125E288 + (ML20125E288)
- ML20125E290 + (ML20125E290)
- ML20125E291 + (ML20125E291)
- ML20125E294 + (ML20125E294)
- ML20125E295 + (ML20125E295)
- ML20125E297 + (ML20125E297)
- ML20125E299 + (ML20125E299)
- ML20125E300 + (ML20125E300)
- ML20125E302 + (ML20125E302)
- PNO-IV-80-004, licensee Discovered Cracks in One of Two Containment Spray Sys in Reactor Bldg.Licensee Will Inspect. Plant Presently in Cold Shutdown While Performing Mods Required by NUREG-0578 + (ML20125E303)
- PNO-III-79-057, on 791209,draining Operation from Svc Water Header of Heat Exchanger Resulted in Unplanned Release of Radioactive Liquid from Primary Side When All Valves Feeding Instrument Header Were Opened + (ML20125E304)
- ML20125E306 + (ML20125E306)
- ML20125E308 + (ML20125E308)
- ML20125E309 + (ML20125E309)
- ML20125E310 + (ML20125E310)
- ML20125E312 + (ML20125E312)
- ML20125E313 + (ML20125E313)
- ML20125E314 + (ML20125E314)
- ML20125E315 + (ML20125E315)
- ML20125E317 + (ML20125E317)
- ML20125E318 + (ML20125E318)
- ML20125E319 + (ML20125E319)
- ML20125E324 + (ML20125E324)
- ML20125E325 + (ML20125E325)
- ML20125E327 + (ML20125E327)
- ML20125E328 + (ML20125E328)
- TXX-3093, Forwards Up Geologic Info.Supersedes 790921 Transmittal.One Oversize Drawing Available in Central Files Only + (ML20125E331)
- ML20125E332 + (ML20125E332)
- ML20125E333 + (ML20125E333)
- ML20125E334 + (ML20125E334)
- ML20125E336 + (ML20125E336)
- PNO-I-79-039, on 791218,two Former Employees of Const Contractors Made Statements That Welding & Concrete Work Improperly Performed.Region 1 Conducting Investigation of Allegations + (ML20125E337)
- ML20125E338 + (ML20125E338)
- PNO-I-79-040, on 791218,contractor Painter Fell from Ladder in Reactor Bldg & Sprained Ankle.Painter Was Treated & Released from Hosp.No Radiation or Contamination Involved + (ML20125E339)
- ML20125E341 + (ML20125E341)
- ML20125E342 + (ML20125E342)
- 05000317/LER-1980-007-01, /01X-0:on 800129,while Conducting Core Flush, Emergency Relief Valve RC-404 Opened.Apparently Caused by High Pressure Signal from Overpressure in Protection Circuit.Valve Shut W/Manual Override + (ML20125E343)
- ML20125E344 + (ML20125E344)
- ML20125E346 + (ML20125E346)
- ML20125E348 + (ML20125E348)
- ML20125E349 + (ML20125E349)
- ML20125E350 + (ML20125E350)