Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125B630 + (ML20125B630)
- ML20125B631 + (ML20125B631)
- ML20125B632 + (ML20125B632)
- IA-84-896, Partial Response to FOIA Request for Records Re NRC or FEMA Evaluation of 841128 Emergency Planning Drill for Facility. Forwards App a Documents.Documents Also Available in PDR + (ML20125B633)
- ML20125B633 + (ML20125B633)
- ML20125B637 + (ML20125B637)
- ML20125B640 + (ML20125B640)
- ML20125B641 + (ML20125B641)
- ML20125B643 + (ML20125B643)
- ML20125B644 + (ML20125B644)
- ML20125B645 + (ML20125B645)
- ML20125B646 + (ML20125B646)
- ML20125B648 + (ML20125B648)
- ML20125B650 + (ML20125B650)
- ML20125B651 + (ML20125B651)
- ML20125B653 + (ML20125B653)
- ML20125B656 + (ML20125B656)
- ML20125B657 + (ML20125B657)
- ML20125B659 + (ML20125B659)
- ML20125B662 + (ML20125B662)
- ML20125B666 + (ML20125B666)
- IR 05000243/1985002 + (ML20125B667)
- ML20125B669 + (ML20125B669)
- ML20125B670 + (ML20125B670)
- ML20125B672 + (ML20125B672)
- ML20125B673 + (ML20125B673)
- ML20125B675 + (ML20125B675)
- ML20125B679 + (ML20125B679)
- ML20125B681 + (ML20125B681)
- ML20125B682 + (ML20125B682)
- ML20125B685 + (ML20125B685)
- L-92-334, Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20125B694)
- ML20125B695 + (ML20125B695)
- ML20125B696 + (ML20125B696)
- ML20125B697 + (ML20125B697)
- ML20125B698 + (ML20125B698)
- ML20125B699 + (ML20125B699)
- 05000245/LER-1991-009, :on 910408,discovered That Main Steam Header Stop Drain Valves 1-MS-5 & 1-MS-6 Exceeded Max Allowable Leakage Rate & Testing Revealed That Listed Valves/Manways Did Not Meet LLRT Requirements.Vane Replaced + (ML20125B700)
- ML20125B702 + (ML20125B702)
- 05000270/LER-1979-009, Forwards LER 79-009/01T-0 + (ML20125B703)
- 05000423/LER-1992-027, :on 921105,electrical Fault Protection Signal in Zone Between Generator & Switchyard Resulted in Reactor Trip,Turbine Trip & Generator Trip.Caused by Spurious Signal from Relays.Design Change to Be Pursued + (ML20125B704)
- ML20125B705 + (ML20125B705)
- 05000334/LER-1979-039-99, /99X-0:on 790920,vital Bus Inverter 4 Failed, Causing Reactor Trip & High Steam Flow Safety Injection Actuation.Caused by Failure of Vital Bus Inverter & Transfer of Vital Bus to Auxiliary Power Supply + (ML20125B709)
- 05000423/LER-1992-026-01, :on 921103,CR Staff Determined That Performing Check Valve Testing Per Surveillance Procedure Would Align Train B of HPSI to Both Hot & Cold Leg Injection Path.Caused by Inadequate Procedure.Mod Program Changed + (ML20125B710)
- 05000270/LER-1979-009-01, /01T-0:on 791209,during Annual Maint of Engineered Safeguard Valves,Hpi Suction Valves from Borated Water Storage Tank Rendered Inoperable.Caused by Inadvertent Removal & Cleaning of Limit Switch Assemblies + (ML20125B712)
- U-600072, Forwards Draft Proposed FSAR Rev Re Effects of Jet Impingement & Justification for Exceptions to Srp,Per SER Outstanding Issue 5.NUREG/CR-2913 Used for Certain Jet Analyses + (ML20125B713)
- ML20125B714 + (ML20125B714)
- ML20125B715 + (ML20125B715)
- ML20125B716 + (ML20125B716)
- 05000334/LER-1979-040-99, /99X-0:on 790920,during Operational Mode 3,vital Bus Inverter 4 Transferred from Auxiliary Power Source to Inverter.Inverter Was Inoperable & Safety Injection Occured. Caused by Operator Error.Personnel Reprimanded + (ML20125B717)
- ML20125B719 + (ML20125B719)