Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-2062, Forwards Monthly Operating Rept for May 1996 for Perry Nuclear Power Plant & Revised Monthly Rept for Apr 1996 + (ML20117M701)
- ML20117M702 + (ML20117M702)
- ML20117M704 + (ML20117M704)
- ML20117M708 + (ML20117M708)
- ML20117M711 + (ML20117M711)
- 1CAN069606, Submits follow-up Info Re Open Containment Personnel Airlock During Core Alterations TS Change Request Requested by + (ML20117M720)
- ML20117M724 + (ML20117M724)
- 05000424/LER-1996-001, :on 960220,nuclear Svc Cooling Water Sys Determined Inoperable Due to Pipe Fatigue.All Discharge Line Weld Indications &/Or Cracks Have Been Repaired & Design Changes Have Been Implemented + (ML20117M727)
- ML20117M734 + (ML20117M734)
- ML20117M746 + (ML20117M746)
- ML20117M747 + (ML20117M747)
- 05000443/LER-1996-006, :on 960816,discovered Missed Surveillance Re Verification of Time Constant of Nis Rate Trip Circuit. Caused by Procedural Inadequacy.Revised Procedures for Performing Analog Channel Operability Test + (ML20117M755)
- ML20117M756 + (ML20117M756)
- ML20117M763 + (ML20117M763)
- ML20117M769 + (ML20117M769)
- ML20117M773 + (ML20117M773)
- 05000482/LER-1996-008, :on 960516,declared Essential Service Water Room Ventilation Inoperable.Caused by Inadequate Procedure. Revised Stn IC-465 & Counseled Personnel + (ML20117M779)
- ML20117M782 + (ML20117M782)
- ML20117M783 + (ML20117M783)
- ML20117M784 + (ML20117M784)
- ML20117M785 + (ML20117M785)
- ML20117M787 + (ML20117M787)
- ML20117M791 + (ML20117M791)
- ML20117M798 + (ML20117M798)
- ML20117M801 + (ML20117M801)
- ML20117M802 + (ML20117M802)
- ML20117M807 + (ML20117M807)
- ML20117M816 + (ML20117M816)
- ML20117M825 + (ML20117M825)
- ML20117M835 + (ML20117M835)
- ML20117M837 + (ML20117M837)
- 05000482/LER-1985-009, :on 850412,ESF Actuation Signal Initiated When Several Radiation Monitors Deenergized.Caused by Ground Fault Indication Tripping Power Supply Breaker.Breaker Reset & Power Restored + (ML20117M847)
- ML20117M849 + (ML20117M849)
- ML20117M850 + (ML20117M850)
- ML20117M870 + (ML20117M870)
- ML20117M871 + (ML20117M871)
- ML20117M872 + (ML20117M872)
- NRC-96-0059, Monthly Operating Rept for May 1996 for Fermi 2 + (ML20117M876)
- ML20117M878 + (ML20117M878)
- TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 + (ML20117M879)
- 0CAN038510, Responds to Violations Noted in Insp Repts 50-313/85-01 & 50-368/85-01.Corrective Actions:Valves in Bearing Cooling Water Line for Unit 1 turbine-driven Emergency Feedwater Pump Reinstalled Prior to Plant Startup + (ML20117M884)
- ML20117M886 + (ML20117M886)
- ML20117M889 + (ML20117M889)
- ML20117M897 + (ML20117M897)
- 1CAN099603, Submits Followup Info Clarifying Permitting Containment Personnel Airlock Doors to Remain Open During Core Alterations + (ML20117M899)
- 05000423/LER-1996-027-02, :on 960813,tornado Missile Protection for Manhole Covers Were Not Installed,Due to Original Construction.All Five Manhole Covers Were Securely Anchored by Placement of Ballast + (ML20117M906)
- 3F0596-11, Forwards Books 1-6 of Underwriters Labs Test Repts for FPC for Feb 1996 + (ML20117M907)
- 05000339/LER-1985-006-01, :on 850426,unit Tripped from 100% Power When 120-volt Ac Vital Bus 2-I Inadvertently Deenergized.Caused by Misidentification of Power Supply Cabinet & Subsequent Opening of Power Supply Breaker to Inverter + (ML20117M916)
- ML20117M917 + (ML20117M917)
- ML20117M918 + (ML20117M918)
- ML20117M928 + (ML20117M928)