Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant
ML20117M816
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1996
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609180107
Download: ML20117M816 (5)


Text

,

Northem States Power Company j

Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 4

September 13,1996 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for August,1996 s

in accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of August is provided.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

40 fA Roger O Anderson Director Licensing and Management issues c:

Regiont.! Administrator-Ill, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg qpq '/,

l'/0061 9609100107 960831 t

PDR ADOCK 05000263 R

PDR

F OPERATING DATA REPORT DOCKET NO.

50-263 DATE 9-3-96 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name Monticello

]

]

2.

Reporting period:

August

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe) :

576.5

]

]

5. Design Electrical Rating (Net MWe) :

552.9

]

]

6. Maximum Dependable Capacity (Gross MWe): 571.5

]

]

7. Maximum Dependable Capacity (Net MWe):

543.5

]

]

8.

If Changes Occur in Capacity Ratings (Itsms Number 3 Through 7) Since Last Report, Give Reasons:

Performance testing of new turbine completed 9.

Power Level To Which Restricted, If Any (Net MWe) :

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 744 5855 220656
12. Number Of Hours Reactor Was Critical 744.0 4768.4 180528.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 4616.1 177486.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1241811 7124457 275177246 g
17. Gross Electrical Energy Generated (MWH) 422732 2415678 93045709
18. Net Electrical Energy Generated (PGG1) 403446 2304903 89036275
19. Unit Service Factor 100.0%

78.8%

80.4%

20. Unit Availability Factor 100.0%

78.8%

80.4%

i

21. Unit Capacity Factor (Using MDC Net) 99.8%

73.0%

75.3%

i

22. Unit Capacity Factor (Using DER Net) 98.1%

71.8%

74.0%

23. Unit Forced Outage Rate 0.0%

4.4%

3.4%

24. Shutdowns Scheduled Cver Next 12 Months (Type, Date, and Duration of Each)

_None

35. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

\\

P

?,

AVERAGE DAILY UNIT POWER LEVEL i

l

~

j DOCKET NO.

50-263 t

UNIT Monticello-DATE 9-3-96 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH OF. August l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(MWe-Net)

(MWe-Net) 1 544.

17 541.

f 2

543, 18 545.

3 543.

19 544.

1 4

544, 20.

543.

5 538.

21 544.

6 540.

22 540.

7 536.

23 541.

8 543.

24 542.

t 9

541.

25 541.

i-l 10 542.

'26 543.

11 542.

27 544.

12 544.

28 543.

13 540.

29 542.

14 543.

30 541.

l 15

547, 31 541.

l

.16 544.

l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

._.r.

+

IMIT SHUrDOUNS AIO POWER REDUCTIONS '

D003T NO. 50-263 IMIT NAME Nticello i

DATE V9-03-% -

COMPMTED BY ~11. H. ' Paustian REPORT MONTH August TELEPHONE _612/295-5151 -

No.

Date Type Duration Reason Method LER System Cause 4 Corrective 11)

(hours)

(2).

of No.

Code e

Ac tion to Shutdown (4)

(5)

Prevent Recurrence (3) l None r

i I

i i

t 4

1 2

3 4

i F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)

B-Maintenance or Test 2-Manual Scram C-Refueling Restriction 3-Automatic Scram 5

D-tor 4-Other (Explain)

IEEE Standard 803A-1983 i

rator Training & License Examination i

F-nistrative G-Operational Error (Explain)

~H-Other (Explain) m.-.

m --

.m--.-.

m

.-..m m m<

i mm.

m

f..

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 9-3-96 i

COMPLETED BY H. H.

Paustlan TELEPHONE 612/295-5151 MONTH AUG 08-01-96 l

to Power operation 08-31-96 i

Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.