ML20117M886
| ML20117M886 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/31/1996 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20117M882 | List: |
| References | |
| NUDOCS 9609180181 | |
| Download: ML20117M886 (10) | |
Text
_.
i l
r 4
OPERATING DATA REPORT DOCtET N3 50-369
' DATE Sentenber 13, 1996 DPERATING STATUS COMPLETED BY R.A. Williaes
- 1. Unit Nase: McGuire I.
TELEPHONE 704-382-5346
- 2. Reporting Period: August I,1996-August 31, 1996
- 3. Licensed Thereal Foner (Mil 3411
- 4. Naseplate Rating (6ross W el:
13051 Notes eNameplate Rating
- 9. Design Electrical Rating (Net M els.
1180 (6ross We) calculated as
- 6. Marioce Dependable Capacity (Gross Mels. 1171 1450.000 MVA :.90 power, l
j
- 7. Marisue Dependable Capacity (Net Mels 1129
. factor per Page iii, i
l
- 8. If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
l I
l
- 9. Power Level To Which Restricted, if Any (Net Mel:
l l
- 10. Reason For Restrictions, if any:
I l
l
> This Month Yr.-to-Date Cueulative
- 11. Heurs in Reporting Period 744.0' 5855.01 129311.0
.12. Number Of Hours Reactor Was Critical 744.0 5276.5 93715.9
- 13. Reactor Reserve Shutdown Hours
--0--
- --0--
I
- 14. Hours 6e'ierator On-Line 744.0
-5184.8
.92716.3'
'l l.
- 15. Unit Reserve Shutdown Hours
-. --0--,
l.
- 16. Gross Thereal Energy fenerated (MM )
2533E02 17429141 292183243 L
- 17. Stoss Electrical Energy Generated (MH) 946791 5950610 100325890 l.
- 18. Net Electrical Energy Generated ( W H1 614245 5717713 95685284.
]
- 19. Unit Service factor
~100.0 08.6 71.7
- 20. L' nit Avaliability factor 100.0 89.6 71.7
~21. Unit Capacity Tactor (Using MDC Net) 96.9 B6.5 64.7
- 22. Ilnit Capacity Facter (Using DER Net) 92.1 62.6 62.0
- 23. Unit Forced Outage Rate 0.0 1.1 13.0
- 20. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachl:
j
.,, Refueling - January 29, 199 7 - 100 days
- 25. If Shut Doon At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved-INITIALCRITICALITY l
INITIAL ELECTRICITY l
COMERCIAL OPERATION l
l l
9609180181 960913 7 PDR ADOCK 05000369 i
R PDR
OPERATING DATA REPORT DOCKET NO 50-369 UNIT McGuire i DATE Sectember 13. 1996 COMPLETED BY R.A. Willians TELEPHONE 704-302-5346 MONTH Aucust. 1996 gal AVERAGE DAftf POWER LEVEL
- PAY, AVERAGE DA!LY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1099 17 1096 2
1094 IB 1096 3
1092 19 1095 4
1092 20 1095 5
1093 21 1096 6
1095 22 1095 7
1095 23 1095 9
1093 24 1095 9
1096 25 1093 10 1094 26 1093 1093 27 1095 12 1096 28 1096 13 1095 29 1095 14 1067 30 1096 13 1091 31 1094 l
16 1099 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369
- UNIT NAME mwy1xe,1 DATE us/13/sb
-REPORT MONTH August 1996 COMPLETED BY x.
A.
nilliams TELEPHONE
( / ve i -a se -o.ss o (1)
(2)
(3)
(4)
(5)
R MET-E HOD
'T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P 1 DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE
.E HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S E
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions 1
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative.
(5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
-. = -. - - - - -
-u. - -
- ~ - - - -
l l
l i
l DOCKET: 50-369 i
l UNIT: McGuire 1 I
Date:
09/13/ %
i i
NARRATIVE
SUMMARY
MONTH: August, tr96 i.
i i
i McGuire Unit i beg an the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.
1 i
I i
l l
i I
1 l
l l
l l
l l
Prepared by: R. A. Williams Telephone:(704)- 382-5346 f
l
\\
r 1
i i
f I
MONTHLY REFUELINO INFORMATION REOUEST l
1.
Facility name:
McGuire. Unit 1 i
2.
Scheduled next refueling shutdown: January 1997 3.
Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
1
.4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
i Ifyes, what will these be?
j i
If no, has reload design and core configuration been reviewed by Safety Review Committee j
regarding unreviewed safety questions?
l 5.
' Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methMs, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: J.9,1 9
(b) in the spent fuelpool: 221 8.
Present licensed fuel pool capacity: J.4fl Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity: Mggh
- g...
DUKE POWER COMPANY DATE: September 13.1996 Name of
Contact:
M Williams Phone: (704)- 382-5346 l
l i
t i
l i
l
OPERATING DATA REPORT DDCKET N0 50-370 DATE Septesber 13. 1996 OPERATING STATUS COMPLETED BY R.A. Williass TELEPHONE 704-382-5346
- 1. Unit Naae McGuire 2
- 2. Reporting Period: August 1, 1996-August 31, 1996
- 3. Licensed Thereal Power (Eti:
3411
- 4. Naseplate Rating (Gross We):
1305e Notes eNaseplate Rating
- 9. Design Electrical Rating (Net We b 1190 (Bross MWe) calculated as
- 6. Maximus Deoendable Capacity (Bross MWel:
1171 1450.000 MA r.90 power
- 7. Marisus Dependable Capacity (Net Web
!!29 factor per Page iii, B. If Changes occur in Capacity Ratings (itees Number 3 Through 7) Since Last N'JREG-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net Me):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cusulative
- 11. Hours in Reporting Period 744.0 5855.0 109607.0
- 12. Number Of Hours Reactor Was Critical 744.0 3939.1 65693.7
- 13. Reacter Reserve Shutdoun Hours
--0--
--0--
--0--
- 14. Hours 6enerster On-Line 744.0 3902.2 84633.0
- 13. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Eross Thereal Energy Generated ( M H) 2530733 12917792 278157441
]
- 17. 6ress Electrical Energy Generated (MH) 852912 4475705 96978981 180 Net Electrical Energy Generated ( MH) 820146 4253604 92995961
- 19. Unit Service Factor 100.0 66.7 77.2
- 20. Unit Availability Factor 100.0 66.7 77.2
- 21. Unit Capacity factor (Using MDC Net) 97.6 64.8 74.4
- 22. Unit Capacity Factor (Using DER Net) 93.4 62.0 71.9
- 23. Unit Forced Outage Rate 0.0 20.5 7.2
- 24. Shutdown Scheduled Over Next 6 Honths (Type, Date, and Duration of Eachl:
None
- 25. If Shut Down At End Of Feport Period. Estinated Date of Startup:
I
- 26. Units In Test Status (Prior to Cassercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATIN6 DATA REFORT DOCKET NO 50-370 UNIT M:Buire 2 DATE Sentenber 13. 1996 '
COMPLETED BY R.A. Williaes TELEPHONE 7M-382-5346 MONTH Aunust,1996 MY, AYERAGE DAILY POWER LEVEL
. QAl AVERAGE DAILY POWER LEVEL (MWe-lieti (MWe-Net)-
1 1106 17 1104 2-1083 18 11M
-3 1991 19 1103 4
!!02 20
' 11M 5-1103 21 1105 6-1104 22 11 %
7 1103 23 1105 8
1103-24 1103-
.9 1105 25 1103 10 1103 26
~1102 11
!!01 27 11M 12 1104 28 IIM 13 1102 29 1103 14
!!02 30 11M 15 11M 31
!!03
-16 1105
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME rituuixw 2 DATE vy/13/sb REPORT MONTH August 1996 COMPLETED BY
- x. a _. williams TELEPHONE tvusi-Juz-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S i
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram (LER Event Report ( N G-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-OperaQor Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
f DOCKET: 50-370 UNIT: McGuire 2 i
Date:
09/13/96 t
i I
f NARRATIVE
SUMMARY
I l
i MONTH: August,1996 McGuire Unit 2 began the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.
I I
I l
i l
I i
1 1
i 1
1 l
l 4
t i
l I
Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
I i
1
?
l
}
'I I
- g.,
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 I
2.
Scheduled next refueling shutdown: September 1997 i
3.
Scheduled restait following refueling: December 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHAN'3E OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
l' If yes, what will these be?
l l
If no, has reload design and core configuration been reviewed by Safety Review Committee
[
regarding unreviewed safety questions?
l 5.
' Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 j
' 7.
> Number of Fuel assemblies (a) in the core: j91 l
(b) in the spent fuel pool: 2f9 l
l 8.
Present licensed fuel pool capacity: 1463 l
Size of requested or planned increase: =
i l
9.
Projected date oflast refueling which can be accommodated by present license capacity:
l December 2Q0J l
l DUKE POWER COMPANY DATE: Scotember 13.1996 i
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l~
i d
8
-.,w,
--,, -