Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117K191 + (ML20117K191)
- 1CAN059607, Forwards Proposed TS Changes Extending Surveillance Test Interval for Reactor Trip Breakers,Reactor Trip Modules & Electronic Trip Relays + (ML20117K196)
- ML20117K199 + (ML20117K199)
- ML20117K203 + (ML20117K203)
- ML20117K208 + (ML20117K208)
- 05000382/LER-1996-010-01, :on 960807,discovered COLSS Not Monitoring Aztilt Due to Constants Not Being Loaded.Default Value for COLSS-CPS Tilt Limit Will Be Changed from 0.03 to 0.00 + (ML20117K209)
- U-602566, Forwards Requests for Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition Through Winter 1981 Addenda,W/Re Performance of non-destructive Exam of Welds + (ML20117K210)
- ML20117K226 + (ML20117K226)
- ML20117K237 + (ML20117K237)
- NG-96-1787, Forwards Rept of Program Performance Info for Duane Arnold Energy Ctr During 6 Month Period Jan-June 1996 + (ML20117K238)
- ML20117K239 + (ML20117K239)
- HL-5185, Forwards Response to Addl Info Re Drywell Air Temp Submittal for Plant + (ML20117K240)
- ML20117K243 + (ML20117K243)
- ML20117K248 + (ML20117K248)
- ML20117K251 + (ML20117K251)
- ML20117K257 + (ML20117K257)
- ML20117K259 + (ML20117K259)
- ML20117K273 + (ML20117K273)
- ML20117K285 + (ML20117K285)
- ML20117K293 + (ML20117K293)
- ML20117K305 + (ML20117K305)
- ML20117K309 + (ML20117K309)
- ML20117K311 + (ML20117K311)
- ML20117K314 + (ML20117K314)
- ML20117K323 + (ML20117K323)
- ML20117K329 + (ML20117K329)
- ML20117K332 + (ML20117K332)
- ML20117K355 + (ML20117K355)
- 05000302/LER-1985-003, :on 850403,determined That 1980 Inservice Insp of once-through Steam Generator B Had Not Fully Examined Length of Generator Tubes.Caused by Personnel Error.Mod of Tech Spec Re Tube Insp Requirements Proposed + (ML20117K358)
- ML20117K366 + (ML20117K366)
- ML20117K374 + (ML20117K374)
- ML20117K376 + (ML20117K376)
- ML20117K395 + (ML20117K395)
- ML20117K400 + (ML20117K400)
- ML20117K403 + (ML20117K403)
- ML20117K407 + (ML20117K407)
- ML20117K412 + (ML20117K412)
- ML20117K413 + (ML20117K413)
- ML20117K417 + (ML20117K417)
- ML20117K422 + (ML20117K422)
- 05000423/LER-1996-012, :on 960515,containment Leakage in Excess of TS Limits Noted,Due to Valve Leakage.Containment Spray Line Penetration 100 Flushed to Remove Any Boron Deposits.W/ + (ML20117K425)
- BECO-96-079, Provides semi-annual Long Term Program (LTP) Update Which Includes Schedule,Commitment Descriptions,Progress Since Last Update & Summary of Changes + (ML20117K437)
- ML20117K440 + (ML20117K440)
- 05000424/LER-1996-009-01, :on 960808,leaking Valve Results in Fuel Handling Bldg Isolation.Down Stream Needle & Relief Valves Were Replaced + (ML20117K443)
- 05000445/LER-1996-007, :on 960809,automatic Reactor Trip Occurred Due to Lightning Strike.Bypass Mod to RPS ESF Channels Initiated + (ML20117K451)
- ML20117K452 + (ML20117K452)
- ML20117K456 + (ML20117K456)
- ML20117K459 + (ML20117K459)
- ML20117K464 + (ML20117K464)
- ML20117K467 + (ML20117K467)
- 05000322/LER-1985-015, :on 850405,results of Annual Sounding of Intake Canal Indicated Bottom Depth Above Tech Spec Limit.Caused by Normal Sediment Deposition.Dredging Completion Expected by 850730 + (ML20117K470)