Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116K670 + (ML20116K670)
- ML20116K678 + (ML20116K678)
- HL-5222, Notifies That Southern Operating Company Telephone Prefix Has Been Changed.Old Prefix Will Be Discontinued as of 961101 + (ML20116K680)
- ML20116K683 + (ML20116K683)
- ML20116K689 + (ML20116K689)
- ML20116K698 + (ML20116K698)
- ML20116K701 + (ML20116K701)
- ML20116K704 + (ML20116K704)
- 05000366/LER-1992-020-01, :on 921010,determined That Sealing Devices for 22 Spare Unit 2 Primary Containment Penetrations Did Not Meet ASME Requirements.Caused by Construction Error.Sealing Devices Will Be Replaced to Meet ASME Code + (ML20116K719)
- 2CAN119201, Confirms That Initial Tests & Activities Described in Correspondence Re GL 89-13, Service Water Sys Problems Affecting Safety-Related Equipment, Have Been Completed for ANO-2 + (ML20116K728)
- ML20116K729 + (ML20116K729)
- ML20116K734 + (ML20116K734)
- ML20116K737 + (ML20116K737)
- U-602064, Monthly Operating Rept for Oct 1992 for Clinton Power Station Unit 1 + (ML20116K749)
- HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 + (ML20116K751)
- ML20116K756 + (ML20116K756)
- ML20116K758 + (ML20116K758)
- ML20116K760 + (ML20116K760)
- ML20116K766 + (ML20116K766)
- 05000266/LER-1992-009, :on 921012,identified That CCW Sys Surge Tank Vent Valves 1&2cc-00017 Did Not Meet Design Basis.Caused by Oversight During Original Design of CCW Sys.Design Will Be Evaluated & Modified If Necessary + (ML20116K769)
- ML20116K770 + (ML20116K770)
- ML20116K771 + (ML20116K771)
- ML20116K774 + (ML20116K774)
- ML20116K778 + (ML20116K778)
- 05000338/LER-1992-013-01, :on 921021,determined That ESF Response Time Testing for AFW Pump Not Performed.Caused by Personnel Error,Resulting in Inadequate Surveillance Test Procedure. Testing Performed & Procedures Revised + (ML20116K781)
- ML20116K783 + (ML20116K783)
- ML20116K784 + (ML20116K784)
- ML20116K785 + (ML20116K785)
- ML20116K786 + (ML20116K786)
- ML20116K795 + (ML20116K795)
- ML20116K800 + (ML20116K800)
- ML20116K801 + (ML20116K801)
- ST-HL-AE-4261, Forwards Response to NRC 920818 Request for Addl Info Re Review of Proposed Changes to TS Currently Under Review by NRC & NRC Contractor Bnl.Info Covers Development of Riskman Code to Assist in risk-based Evaluation of TS + (ML20116K803)
- 05000445/LER-1992-002-01, :on 921012,manual Reactor Trip Due to Feedwater Flow Control Valve Failure.Pressure Regulators in Other Three Unit 1 FCVs & Four Unit 2 FCVs Were Verified to Be 0-125 Psig Regulators,As Required + (ML20116K810)
- LD-92-107, Forwards Seismic Analysis Structural Model Details for Sys 80+,requested by NRC 920923 & 1007 Telcons,Consisting of Schematic of Nuclear Island & Nuclear Annex Structures & Table Listing Soil Layers & Properties + (ML20116K817)
- 05000416/LER-1992-018, :on 921013,EDGs 11 & 12,mfg by Transamerica Delavel,Inc Rolled Via Air Start Sys More than 8 H Following Shutdown.Caused by Lack of Effective Method for Triggering Air Rolls.Requirements Amended + (ML20116K831)
- ML20116K833 + (ML20116K833)
- ML20116K841 + (ML20116K841)
- ML20116K858 + (ML20116K858)
- 05000373/LER-1992-011-07, :on 921015,wrong High Radiation Door Downgraded Due to Personnel Error,Resulting from Initial Typing of High Radiation Area Door List.Physical Control of Door 136 Established & Door Properly Posted + (ML20116K869)
- ML20116K870 + (ML20116K870)
- ST-HL-AE-4240, Forwards Rev 7 to Chapter 2.0 of Operations QA Plan Program Description, Consisting of Change QA-005 + (ML20116K872)
- ML20116K878 + (ML20116K878)
- ST-HL-AE-4260, Forwards Response to NRC 921026 Telcon Request for Addl Info Re 920928 Application for Amends to Licenses NPF-76 & NPF-80,consisting of Rev 1 to SE for Proposed Rev to Shutdown Margin in TS 3.1.1.1 + (ML20116K891)
- ML20116K894 + (ML20116K894)
- ML20116K899 + (ML20116K899)
- ML20116K926 + (ML20116K926)
- ML20116K939 + (ML20116K939)
- ST-HL-AE-4254, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Plant Procedures Revised to Control Use of Changing Acceptance Criteria by 921130 + (ML20116K942)
- ML20116K945 + (ML20116K945)
- ML20116K947 + (ML20116K947)