Application for Amend to License NPF-12,revising Tech Spec 3/4.8.4 to Indicate Which Electrical Equipment Protective Devices Required to Be Operable & Deleting Table 3.8.1 Re Overcurrent Protective Devices.Fee Paid
ML20116K858
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/29/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20116K862 List:
References
NUDOCS 8505030407
Download: ML20116K858 (2)


Text

r.-

c 4

SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 764 COLuusiA. south CAROLINA 29218 April 29, 1985

o. w. oe=ON. a VeCE PRE 510ENT NUCLE AP OPER AYiONS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Deletion of Technical Specification Table 3.8.1

Dear Mr. Denton:

South Carolina Electric & Gas Company (SCE&G) hereby requests a revision to Technical Specification 3/4.8.4, " Electrical Equipment Protective Devices."

This proposed revision, as shown in the attached marked-up Technical Specification pages, deletes Table 3.8.1, " Containment Penetration Conductor Overcurrent Protective Device Test Setpoint Criteria" and revises Specification 3/4.8.4 to indicate which devices are required to be operable. The revision also incorporates the administrative page numbering changes to the Index and Technical Specification pages necessary as a result of deleting the table.

The devices comprising Table 3.8.1 are those containment penetration conductor overcurrent protective devices which are required for penetration protection.

The. specific test setpoint and response time for each of these devices was established by engineering evaluation and vendor supplied recommendations.

SCE&G's position is that the table itself is not necessary, provided Specification 3/4.8.4 specifies that those devices required to be operable to provide containment overcurrent protection are to be tested in accordance with the Technical Specification.

SCE&G has determined that a finding of no significant hazards is appropriate for this proposed amendment. The request does not involve a significant increase in the probability or consequences of an accident previously evaluated because the Technical Specification surveillances for required protection devices remain unchanged. The possibility of a new or different kind of accident from any accident previously evaluated is not created because the physical plant design is not altered by deleting the table. Also the change will not involve a significant reduction in a margin of safety because all containment penetration conductor overcurrent protective devices required for penetration protection will be demonstrated as operable using setpoints and response times determined by engineering evaluation and vendor supplied information. These setpoints and required response times are established to ensure the devices are able to provide penetration protection.

This change has been reviewed and approved by both the Plant Safety Review Committee and the Nuclear Safety Review Committee. Please find enclosed the application fee of one hundred fifty dollars ($150.00) required by Title 10 of the Code of Federal Regulations.

p

.o2o.o7..o..

g

@p p

y33 PDR ADOCK 05000395 P

pop

(

g J

3 c

n 1

Mr. Harold R. Denton April 29, 1985 Page Two If you should have any questions, please advise.

Very truly yours,

/

/

u O. W. Dix / f on, Jr.

AMM:OWD:rh Enclosures cc:

V. C. Summer T. C. Nichols/0. W. Dixon, Jr.

E. H. Crews, Jr.

W. A. Williams, Jr.

D. A. Nauman J. N. Grace Group Managers

0. S. Bradham C. A. Price C. L. Ligon (NSRC)

K. E. Nodland R. A. Stough G. Percival C. W. Hehl J. B. Knotts, Jr.

NPCF File l

]

'