g GPU Nucleet Corpotetton p
Qggf Post Office Box 388 g
Route 9 South Forked River, New Jersey 087310388 609 971-4000 Wnter's Direct Dial Numter:
-S321-92-2319 November 12, 1992 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.
If you should have any questions, please contact Brenda DeMerchant, Oyster Creek LicensingEngineerat(609)971-4642.
Sincerely, J.
[);
J. J Barton V $ President and Director ster Creek JJB/BDEM: jc-Attachment (MOR RPT.oCT) cc:
Administrator, Region 1 Senior NRC Resident inspector Oyster Creek NRC Project Manager l
1700 0 <!
9211170377 921031 PDR ADOCK 05000219
/,1 ('
f R.
/_,96!I
(
GPU Nuclear Corporaton is a subsday of General Pubhc Utmtiet, Corpovation
s-'
MONTHLY OPERATING REPORT October, 1992 Oyster Creek operated with no significant power reductions during the month of October _ and had a capacity factor of 99.4%, generating 451,851 megawatts not output.
4
+
w sw,
-y-,.
- ~ ~, -
v--
---v..ww_,,
y,
.--e, w-v u,.-
.-2,,e,w.h.
a-
,,r,--
s 6
- y,
~..
-w,
- v. waya n.p
s.
fiONTHLY OPERATING REPR I The following Licensee Event Reports were submitted during the month of-l October. 1992:
~
LUL92-fl2 On September 12, 1992 whileperforminganElectromaticReliefValve(EMRV)
Pressure Sensor surveillance, the "As found" trip setpoints for the high pressure relief function on two EMRVs were above that specified in the Technical Specifications.
The cause of this occurrence is attributed to setpoint repeatability and instrument drift.
The design setpoint repeatability allows the "as-found" value to be within 2.5 psig of the Technical Specification limit.
Previous surveillance records indicate that these instruments frequently undergo additional drift within Technical Specification limits due to changing plant and envi,onmental conditions.
This occurrence is considered to have minimal safety significance as the automatic
?
depressurization function of the EMRVs is not affected by these pressure switches, all five EMRVs would have actuated to relieve pressure, and the Isolation Condenser System and turbine bypass valves were fully operable.- A calculation concludes that all EMRVs could exceed their Technical Specification-setpoints by 10 psig without an adverse effect on plant safety.
The pressure switches-w-, adjusted to actuate within the lechnical.
Specification limit.
A new pressure sensing system is to be installed in accordance with the Oyster Creek Integrated Schedule, which currently specifies the Cych 15 refueling outage for completion of this project.
3 h
Y.;
-. -,,.a-.n.
a:-
.a
.-, a u -
a --- - :.
.L-.
.,2.-.2-.-..
.;---.=... -. -
a.
F Oyster Creek Station #1 Locket No. 50-219 i
REFUELING INFORMATION - OCTOBER, 1992
~
Name of Facility: Dyster Creek station #1 Scheduled date for next refueling shutdowns November 27, 1992 Scheduled date for restart following refueling:
February-10, 1993 l
h Will refueling or resumption of operation thereafter require a Technical-f specification change or other license amendment?
No important licenair) considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
1.
General Electric Fuel Assemblies Fuel design -and performance analysis methods have been approved by the NRC.
2.
Exxon Fuel Assemblies - No major changes have been made nor are there any anticipated.
The number of fuel' assemblies (a) in the core 560
=
(b) in the spent fuel storage pool = 3744 (c) in dry storage E
=
The present. licensed spent fuel pool storsgo capacity and the size of _ any -
increase in licensed storage capacity that has been requested or.la planned, in number of fuel assemblies:
Present Licensed Capacity:
2600 The projected date of the last refueling that can be discharged to.the spent fuel' pool assuming the present' licensed capacity:
Full core discharge ' capacity to - the spent fuel pool will be available through.the 1996' refueling outage.
NRC_RPT*WPD/66'
3 t
t
)
AVERAGE DAILY POWER LEVEL r
NET MWe j
DOCKET #..........
.50-219 i
UN17.
. OYSTER CREEK #1
+
REPORT DATE.
. NOVEMBER 11, 1992 COMPILED DY.
. ED BRADLEY TELEPHONE #.
.609-971-4097 i
MONTH:
OCTOBER, 1992 I
618
-16.
614 2.
619 17.
615 3.
618 18.
617 4.
619 19.
616 5.
620 20.
611 6.
619 21.
618 7
618 22.
620 i
8.
619
-23.
619 9
615 24._
594 r
10.
518' 25.
617 11.
515 26.
619-12.
532 27.
624 1
13.
617 28, 621-14.
-616 29:
622 15.
616 30, 615e 31.
580
-s r
L I-
'P NRC_RPT.WPD/6*,
i 4
5 l
t n,,
-,.e,
. - -..N A,
l
- A?
an,...,--,-
. - -. ~ _ _. - - - -. _ -. -.
. ~. -. - _.. ~..
l OPERATING DATA REPORT l
OPERATING STATUS
- 1. DOCKETt 50-219 3.
TY OT ED BRADLEY (609)971-4097
- 4. LICENSED THER!(AL POWER (HWt):
1930
- 5. NAMEPLATE RATING (GROSS HWe):
687.5 x 0.8 = 550
- 6. DESIGN ELECTRICAL RATING (NET MWe):
650
- 7. MAXIHUM DEPENDABLE CAPACITY (GRGSS HWo):
632
- 8. MAXIMUM DEPENDADLE CAPACITY (HET MWe):
610
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
NONE i
- 10. POWER. LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
f NONE
- 11. REASON FOR RESTRICTION, IF ANY:
NONE j
dQHTH YEAR CUMULATIVE
.v
- 12. REPORT PERIOD HOURS 745.0 7320.0 200376.0
- 13. IlOURS RX CRITICAL 745.0 6894.3-131257.0
- 14. RX RESERVE SHUTDOWN llRS 0.0 0.0 918.2
- 15. HRS GENERATDR ON-LINE 745.0 6815.8 127898.1 l
- 17. GROSS THERM ENERGY (HWH) 1409697 12924776 217250134-
- 18. GROSS ELEC ENERGY (HWH) 469307 4301970 72PB7600 j
- 19. NET ELEC ENERGY-(HWH) 451851 4139223 7004f I
.20. UT SERVICE FACTOR 100.0-93.1
...e.
- 21. UT. VAIL FACTOR 100.0 93.1 64.4 g
- 24. UT FORCED OUTAGE RATE 0.0 3.8-11.1
- 25. FORCED OUTAGE HRS 0.0 266.1
-15957.3
- 26. SHUTDOWNS SCHEDULEb OVER NEXT 6 MONTHS,(TYPE, DATE, DURATION):
14-R-NOVEMBER 27,-1992, 75 DAYS
- 27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A F
NRC_RPT.WPD/68.
9 f
9 a.m* e r w' rv-e r-
~,--vv.
w-E, i'r"e-
-v'
- w*- t e 5 w wi=
w m
-w2 r-
'u-'I,-:e.m,+=-..,m.---
,rEr
, s e 'o a
-=
8.,
O>
+
6 b
e 4
N I. E li - $"
E E
x-ti 0
3 E in kY a
3 F
i r
a
~
n -*
es: ps de
((ji i ;g
+
-i
-b, p1 i
4 A J
.A 4 e a
V 9
g 1
f.4 3
l cv i
~
g w
nm g~
e g "l%t
[.
s SE E E
l rE5 E B.
l]}:
lf h
l gag I. a I, i i
y I
s; 2
1
~ 2 y' C
L-k' 4
7.
7
?-
t'
- n j g"E gl F hgg u
!a i :n l-.i o
~
h
,4 o.$
.1 W-
- g M
P e +-s"
-.ss v< e w r t yrw-vpens me me.r e rew -t' e r m.tn F---w-tvr--
s-m er
,m,--
w-'v rrer-we=+r s< ire.--
- w=t"
--