Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106J408 + (ML20106J408)
- ML20106J415 + (ML20106J415)
- ML20106J419 + (ML20106J419)
- 2CAN018503, Monthly Operating Rept for Dec 1984 + (ML20106J420)
- 05000260/LER-1984-007-04, :on 840922,MSIVs B & C Had Excessive Leakage Above Tech Spec Limits.Cause Not Stated.Valve Poppet Will Be Machined & Valve Seat Lapped to Ensure Proper Seating. Also Reportable Per Part 21 + (ML20106J423)
- ML20106J426 + (ML20106J426)
- ML20106J429 + (ML20106J429)
- ML20106J436 + (ML20106J436)
- ML20106J446 + (ML20106J446)
- ML20106J449 + (ML20106J449)
- BSEP-85-0040, Monthly Operating Repts for Dec 1984 + (ML20106J454)
- ML20106J457 + (ML20106J457)
- ML20106J466 + (ML20106J466)
- 05000388/LER-1985-002, :on 850112,nonlicensed,nonutility Electrician Caused Reactor Protection Sys Motor Generator M-G Set to Trip When Wrench Came in Contact W/Energized Conductor. Caused by Failure to Isolate Equipment + (ML20106J487)
- ML20106J495 + (ML20106J495)
- ML20106J510 + (ML20106J510)
- ML20106J512 + (ML20106J512)
- ML20106J513 + (ML20106J513)
- ML20106J515 + (ML20106J515)
- ST-HL-AE-5333, Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (ML20106J516)
- ML20106J522 + (ML20106J522)
- ML20106J526 + (ML20106J526)
- ML20106J527 + (ML20106J527)
- ML20106J528 + (ML20106J528)
- ML20106J536 + (ML20106J536)
- ML20106J537 + (ML20106J537)
- HL-5118, Requests That NRC Grant Encl Third 10-yr Interval ISI Program Requests for Relief RR-13 & RR-14,based on Encl ASME Code Cases N-522 & N-532,respectively,in Response to NRC RAI & Clarification Re Util 960126 Submittal + (ML20106J539)
- ML20106J540 + (ML20106J540)
- ML20106J550 + (ML20106J550)
- ML20106J553 + (ML20106J553)
- ML20106J555 + (ML20106J555)
- ML20106J574 + (ML20106J574)
- DCL-84-322, Responds to NRC Re Violations Noted in Insp Rept 50-275/84-23.Corrective Actions:Employees Assigned to Onsite or Corporate Emergency Organization Will Be Trained or Retrained + (ML20106J578)
- HL-5123, Forwards Rev 14B to Ei Hatch Nuclear Plant Units 1 & 2 FSAR Update & Rev 11B to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis Update + (ML20106J580)
- ML20106J581 + (ML20106J581)
- ML20106J589 + (ML20106J589)
- 0CAN028501, Forwards Remainder of Class III Fee for 830914 Application for Tech Spec Change Re Leak Testing of Sealed Radioactive Sources Installed in Radioactive Sys,In Response to + (ML20106J591)
- ML20106J595 + (ML20106J595)
- ML20106J598 + (ML20106J598)
- ML20106J599 + (ML20106J599)
- ML20106J603 + (ML20106J603)
- ML20106J609 + (ML20106J609)
- ML20106J610 + (ML20106J610)
- ML20106J620 + (ML20106J620)
- ML20106J629 + (ML20106J629)
- ML20106J633 + (ML20106J633)
- ML20106J634 + (ML20106J634)
- ML20106J647 + (ML20106J647)
- ML20106J648 + (ML20106J648)
- ML20106J653 + (ML20106J653)
- ML20106J665 + (ML20106J665)