ML20106J528
| ML20106J528 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/05/1996 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-96-01, GL-96-1, NUDOCS 9604110079 | |
| Download: ML20106J528 (1) | |
Text
Southcrn Nucim Operatmg Company Post Offics Box 1295 Birmegham. Alabama 35201 Tsfsphons (205) 868 5131 Southern Nudear Operating Company o.v. uorey Vice President Farley Project April 5, 1996 the southern electnc system Docket Nos.: 50-348 NRC GL 96-01 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Response To NRC Generic Letter 96-01
" Testing Of Safety-Related Logic Circuits" Ladies and Gentlemen:
i Generic Letter 96-01, dated January 10,'1996, notified licensees about problems with i
inadequate testing of safety-related logic circuits. This letter provides the NRC requested 60-day response for Farley Nuclear Plant (FNP).
Southern Nuclear Operating Company (SNC) will perform a comparison of electrical i
schematic drawings and logic diagrams associated with the Reactor Trip System (RTS),
Engineered Safety Features Actuation System (ESFAS) actuation logic, and Emergency Diesel Generator (EDG) load shedding and sequencing against the plant surveillance test procedures.
This comparison will ensure all portions of the logic circuitry are adequately tested in accordance with Technical Specifications requirements. If necessary, surveillance procedures will be revised to ensure compliance with Technical Specifications requirements.
The engineering review / comparison process has been initiated. SNC will complete the review and any required actions by the end ofFNP's scheduled refueling outages in March 1997 for Unit I and March 1998 for Unit 2. Should you have any questions, please advise.
9604110079 960405 Respectfully submitted, PDR ADOCK 05000348 P
PDR N1f
~-
m Dave Morey Y
1996 Sworn to andsubscribedbeforNeauj56 this nfadA
/,
l Y
My Commi ion re :
2>
L TrR/ cit:GL9601. doc Attachments 110012 cc:
Mr. S. D. Ebneter, Region II Administrator Mr. B. L. Siegel, NRR Senior Project Manager 3,/ I g' Mr. T. M. Ross, FNP Sr. Resident Inspector M