e MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE January 1. 198s COMPLsTsu BY D.
E: Heinlein TELEPHONE (314)'676-8208 PART A OPERATIONS
SUMMARY
DECEMBER 1984 During the month of December, the Power Ascension Testing Program was completed and the unit was turned over to Load Dispatching on December 19 at 9:30 CST.
O PART B PORV AND SAFETY VALVE
SUMMARY
~
The PORV's opened on December 17 due to a pressure transient initiated by 50%
load rejection from 100% power test.
The 50% load rejection from 100% power test was performed on ' December 19 with no cha11ence to the PORV's.
The safety valves were not challenced durine the month.
jY I!/
B502150636 841231 CA-#804 gDRADOCK 05000483 05/09/84 PDR QDP-ZZ-04204 Page 1 of 4 l
Part C AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE inn"arv A-1985 COMPLETED BY K. R.
Bryant TELEPHONE (314) 676-8292 MONTH DECEMBER 1984 a
DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1 977.6 17 479.8 975.5 127.1 2
ig 1019.4 979.0 3
3,,
1087.9 1115.3 5
1105.5 21 1053.5 5
~
1110.5 1065.6 4
22 1115.3 1094.5 7
23 3
1117.0 24 1050.7 g
1118.4 25 1113.1 1052.0 1105.0 10 26 0.0 1093.1 39 27 337.5 1093.1 12 3
1072.3 1099.4 i3 29 1116.3 1111.2 34 y
1111.5 832.6 15 39 16 1102.7 0 [0 f84 Page 2 of 4 QDP-ZZ-04204
~
Part D OPERATING DATA REPORT 50-483
~
DOCKET NO.
Callaway UNIT DATE January 4, 1985 K. R. Bryant
- COMPLETED BY i
(314) 676-8292 TELEPHONE OPEF.ATING STATUS December 1984 GROSB NOURS IN REPORTING PERICO:
302.5 i
- t. REPORTING PERIOD:
- 2. CURRENTLY AUTHORIZED FOWER LEVEL (MWO: 341l MAX. DEPEND. CAPACITY (MWo Nott: Not vet known l
DESIGN ELECTRICAL RATING IMWe Ned:_ I I 70 100%
- 3. POWER LEVEL TO WHICH RESTRICTED flF ANY) IMWo Noth t
- 4. REASONS FOR RESTRICTION (IF ANYh THIS MONTH YR TO DATE CUMULATIVE 302.5 302.5 302.5
- 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0
0 0
- s. RE ACTOR RESERVE SHUTDOWN MOURS 302.5 302.5 302.5 l
7
- 7. HOURS GENERATOR ON UNE 0
0 0
- 8. UNIT RESERVE SHUTDOWN HOURS
- 9. GROSS THERMAL ENERGY GENERATED IMWHI
. 1.,001,525 1,001,525 1,001,525 to. GROSS ELECTRICAL ENERGY GENERATED IMWM).
339,180 339,180 339.180 3
i
- 11. NET ELECTRICAL ENERGY GENERATED (MWM) 100%
100%
100%
- 12. REACTOR SERVICE FACTOR 100%
100%
100%
- 13. REACTOR AvAiLAslLITY F ACTOR 100%
100%
100%
- 14. UNIT SERVICE FACTOR 100%
100%
100%
1S. UNIT AVAILAglLITY FACTOR NA NA NA l
- 14. UNIT CAPACITY FACTOR tuosa, MDCI 95.3%
95.3%
95.37
- 17. UNIT CAPACITY F ACTOR (Ussng Design MWei.
0%
0%
0*z
- 18. UNIT FORCED OUTAGE RATE
- 19. SMUTDOF'NS SCHEDULED OVER NEXT S MONTMS (TYPE DATE. AND DURATION OF EACHl: NONE
- 20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
NA
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONI:
FORECAST ACNIEVED INITI AL CRITICALITY 10/2/84 10/24/84 INITIAL ELECTRICITY COMMERCIAL OPERATION 12/19/84*
- Unit placed in service. Commercial operation pending Missouri Public g
Service Commission hearing.
Page 3 of 4 QDP-ZZ-04204 i
m.a
-..w e
m e-
-w.---
--W s-e-+n ar-
- m
-#**e,-s-e-F--n
-rc a--
et i e--
n l
i
-a 1
i Part E DOCKET NO.
50-483 i
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE January 3, 1984
- f D. E. Heinlein
'l COMPLETED BY 1ELEPHONE (314) 676-8208 REPORT MONTil JECEMBER 1984
.i METHOD OF TYPE SHUTTING DOM i
F: FORCED DURATaON THE REACTOR OR
.]
NO.
DATE S: SCHEDULED IHOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS I
i 1
841231 Scheduled H
1 Reduced to 50% power to' clean up secondary chemistry.
f i
l SueAMARY:
i-I i
l CA-#804 1
- 05/09/84 Page 4 of 4 QDP-ZZ-04204
<g.
1 2
e
[,.f._
e l< % ' b *~
.9 3
- 3--
r.
r U NION Electric COMPANY' CALLAWAY PLANT
- MAILING ADDRESS:
P. O. BOX S2O FULTON MO. 65251 January 8, 19_85 Director, Resource Management
-U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1013
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBER 1984 The enclosed Monthly Operating Report for December 1984 is submitted pursuant to section 6.9.1.8 of the callaway Unit 1 Technical Specifications.
h v
S. E. Miltenberger Manager, Callaway Plant s<sp/.s MET /WRC/RRG/drs Enclosure cc: Distribution attached
??
4
.is i
r
)1
~ *.
cc distribution for ULNRC-1013 s.
with enclosures Mr. James'G.'Keppler.
Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission
' Region III
'799 Roosevelt Road:
Glen Ellyn, IL 60137 Director
-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, CA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 i
270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public Service Commission D. F. Schnell J. F. McLaughlin j
J. E. Davis (Z40MOR)
R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Campbell M. E. Taylor W. R. Robinson (QA Record)
P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date 4
, _.