Monthly Operating Rept for Dec 1984
ML20106J449
Person / Time
Site: Callaway 
Issue date: 12/31/1984
From: Bryant K, Heinlein D, Miltenberger S
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1013, NUDOCS 8502150636
Download: ML20106J449 (6)


Text

.

e MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE January 1. 198s COMPLsTsu BY D.

E: Heinlein TELEPHONE (314)'676-8208 PART A OPERATIONS

SUMMARY

DECEMBER 1984 During the month of December, the Power Ascension Testing Program was completed and the unit was turned over to Load Dispatching on December 19 at 9:30 CST.

O PART B PORV AND SAFETY VALVE

SUMMARY

~

The PORV's opened on December 17 due to a pressure transient initiated by 50%

load rejection from 100% power test.

The 50% load rejection from 100% power test was performed on ' December 19 with no cha11ence to the PORV's.

The safety valves were not challenced durine the month.

jY I!/

B502150636 841231 CA-#804 gDRADOCK 05000483 05/09/84 PDR QDP-ZZ-04204 Page 1 of 4 l

Part C AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE inn"arv A-1985 COMPLETED BY K. R.

Bryant TELEPHONE (314) 676-8292 MONTH DECEMBER 1984 a

DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 1 977.6 17 479.8 975.5 127.1 2

ig 1019.4 979.0 3

3,,

1087.9 1115.3 5

1105.5 21 1053.5 5

~

1110.5 1065.6 4

22 1115.3 1094.5 7

23 3

1117.0 24 1050.7 g

1118.4 25 1113.1 1052.0 1105.0 10 26 0.0 1093.1 39 27 337.5 1093.1 12 3

1072.3 1099.4 i3 29 1116.3 1111.2 34 y

1111.5 832.6 15 39 16 1102.7 0 [0 f84 Page 2 of 4 QDP-ZZ-04204

~

Part D OPERATING DATA REPORT 50-483

~

DOCKET NO.

Callaway UNIT DATE January 4, 1985 K. R. Bryant

- COMPLETED BY i

(314) 676-8292 TELEPHONE OPEF.ATING STATUS December 1984 GROSB NOURS IN REPORTING PERICO:

302.5 i

t. REPORTING PERIOD:
2. CURRENTLY AUTHORIZED FOWER LEVEL (MWO: 341l MAX. DEPEND. CAPACITY (MWo Nott: Not vet known l

DESIGN ELECTRICAL RATING IMWe Ned:_ I I 70 100%

3. POWER LEVEL TO WHICH RESTRICTED flF ANY) IMWo Noth t
4. REASONS FOR RESTRICTION (IF ANYh THIS MONTH YR TO DATE CUMULATIVE 302.5 302.5 302.5
5. NUMSER OF HOURS REACTOR WAS CRITICAL 0

0 0

s. RE ACTOR RESERVE SHUTDOWN MOURS 302.5 302.5 302.5 l

7

7. HOURS GENERATOR ON UNE 0

0 0

8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED IMWHI

. 1.,001,525 1,001,525 1,001,525 to. GROSS ELECTRICAL ENERGY GENERATED IMWM).

339,180 339,180 339.180 3

i

11. NET ELECTRICAL ENERGY GENERATED (MWM) 100%

100%

100%

12. REACTOR SERVICE FACTOR 100%

100%

100%

13. REACTOR AvAiLAslLITY F ACTOR 100%

100%

100%

14. UNIT SERVICE FACTOR 100%

100%

100%

1S. UNIT AVAILAglLITY FACTOR NA NA NA l

14. UNIT CAPACITY FACTOR tuosa, MDCI 95.3%

95.3%

95.37

17. UNIT CAPACITY F ACTOR (Ussng Design MWei.

0%

0%

0*z

18. UNIT FORCED OUTAGE RATE
19. SMUTDOF'NS SCHEDULED OVER NEXT S MONTMS (TYPE DATE. AND DURATION OF EACHl: NONE
20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

NA

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONI:

FORECAST ACNIEVED INITI AL CRITICALITY 10/2/84 10/24/84 INITIAL ELECTRICITY COMMERCIAL OPERATION 12/19/84*

  • Unit placed in service. Commercial operation pending Missouri Public g

Service Commission hearing.

Page 3 of 4 QDP-ZZ-04204 i

m.a

-..w e


m e-

-w.---

--W s-e-+n ar-

    • m

-#**e,-s-e-F--n

-rc a--

et i e--

n l

i

-a 1

i Part E DOCKET NO.

50-483 i

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE January 3, 1984

f D. E. Heinlein

'l COMPLETED BY 1ELEPHONE (314) 676-8208 REPORT MONTil JECEMBER 1984

.i METHOD OF TYPE SHUTTING DOM i

F: FORCED DURATaON THE REACTOR OR

.]

NO.

DATE S: SCHEDULED IHOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS I

i 1

841231 Scheduled H

1 Reduced to 50% power to' clean up secondary chemistry.

f i

l SueAMARY:

i-I i

l CA-#804 1

  • 05/09/84 Page 4 of 4 QDP-ZZ-04204

<g.

1 2

e

[,.f._

e l< % ' b *~

.9 3

3--

r.

r U NION Electric COMPANY' CALLAWAY PLANT

- MAILING ADDRESS:

P. O. BOX S2O FULTON MO. 65251 January 8, 19_85 Director, Resource Management

-U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1013

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBER 1984 The enclosed Monthly Operating Report for December 1984 is submitted pursuant to section 6.9.1.8 of the callaway Unit 1 Technical Specifications.

h v

S. E. Miltenberger Manager, Callaway Plant s<sp/.s MET /WRC/RRG/drs Enclosure cc: Distribution attached

??

4

.is i

r

)1

~ *.

cc distribution for ULNRC-1013 s.

with enclosures Mr. James'G.'Keppler.

Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission

' Region III

'799 Roosevelt Road:

Glen Ellyn, IL 60137 Director

-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, CA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 i

270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public Service Commission D. F. Schnell J. F. McLaughlin j

J. E. Davis (Z40MOR)

R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Campbell M. E. Taylor W. R. Robinson (QA Record)

P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date 4

, _.