- ML20105B206 + (ML20105B206)
- 05000373/LER-1984-093-01, :on 841219,plastic Bag Containing Radioactive Debris Found in Turbine Bldg Laundry Sample Tank Room (non-high Radiation Area).Cause Not Stated.Debris Removed to Secured High Radiation Area + (ML20105B210)
- 05000397/LER-1985-004, :on 850116,determined That 841226 Discovery of Failure to Perform Weekly Fire Pump Battery Surveillance Reportable.Caused by Deficiency in Program Scheduling. Surveillance Scheduling Procedures Revised + (ML20105B212)
- 05000338/LER-1984-022, :on 841127,fire Protection Sys Main Header Ruptured,Causing Sys to Be Inoperable.Caused by Pipe Crack Probably Occurring During Installation.Ruptured Section of Pipe Replaced + (ML20105B219)
- RBG-19963, Final Deficiency Rept DR-225 Re Velan Engineering,Ltd Supplied Motor Operated Valve Motors W/Higher Stall Torques than Required by Specs.Initially Reported on 841221.Complete SMB2-40 Actuators Will Be Used as Replacements + (ML20105B221)
- ML20105B222 + (ML20105B222)
- 05000333/LER-2020-002, Unanalyzed Condition Due to Unprotected Control Circuits Running Through Multiple Fire Areas + (ML20105B225)
- ML20105B230 + (ML20105B230)
- ML20105B235 + (ML20105B235)
- ML20105B246 + (ML20105B246)
- ML20105B247 + (ML20105B247)
- 05000352/LER-1985-042, :on 841231,during Startup,Drywell Radiation Monitoring Sys Supply & Return Isolation Valves SV-026-190A & SV-026-190C Failed to Close Automatically.Caused by Incorrect Wiring.Control Logic Rewired + (ML20105B254)
- 05000454/LER-1985-001-02, :on 850103,auxiliary Bldg Vent Stack Monitor Tripped Due to Filter Loading.Caused by Personnel Error. Particulate Filter Collected from Monitor But Not Analyzed as Required to Meet Tech Specs + (ML20105B256)
- ML20105B260 + (ML20105B260)
- TXX-2003, Response to Request for Additional Information Regarding Exigent License Amendment 20-003 Revision to Technical Specification 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program + (ML20105B268)
- 05000278/LER-1985-001-02, :on 850101,w/plant at 85% Power,Inverter Supplying Power to HPCI Instrumentation Failed.Caused by Three Failed Microfared Capacitors.Hpci Declared Inoperable Until Failed Inverter Replaced + (ML20105B274)
- RBG-19958, Interim Deficiency Rept DR-229 Re Defective in-core Guide Tube Stabilizers Supplied by Ge.Interim or Final Status Rept Will Be Provided by 850306 + (ML20105B287)
- 05000237/LER-1985-002-02, :850103,interlock Doors Simultaneously Opened. Caused by Doors Closing Too Quickly & Bouncing Back.Closure Arms for Interlock Doors Adjusted to Allow Slower Closing + (ML20105B289)
- ML20105B298 + (ML20105B298)
- ML20105B301 + (ML20105B301)
- 05000237/LER-1985-001-03, :on 850104,4-kV Breaker 2329 Failed to Trip Open During Breaker Differential Relay Testing.Caused by Cut Wires in Tripping Logic.Wires Reconnected + (ML20105B309)
- ML20105B332 + (ML20105B332)
- 05000333/LER-1985-001, :on 850104,HPCI Steam Supply Isolation Valve Breaker Alarm Relay Failed.Necessary Repairs Resulted in HPCI Sys Being Declared Inoperable for 2 1/2 H.Caused by Faulty Dc Coil + (ML20105B343)
- ML20105B356 + (ML20105B356)
- RBG-19959, Interim Deficiency Rept DR-215 Re Uninterruptible Power Supply Inverters Supplied by Elgar Corp.Interim or Final Status Rept Will Be Provided by 850207 + (ML20105B360)
- ML20105B365 + (ML20105B365)
- ML20105B375 + (ML20105B375)
- PY-CEI-NRR-1545, Monthly Operating Rept for Aug 1992 for Perry Nuclear Power Plant Unit 1 + (ML20105B382)
- ML20105B387 + (ML20105B387)
- RBG-37490, Monthly Operating Rept for Aug 1992 for River Bend Station, Unit 1 + (ML20105B388)
- HL-2914, Monthly Operating Repts for Aug 1992 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20105B395)
- 05000328/LER-1984-021-02, :on 841229,reactor Trip Occurred on Loop 4 lo-lo Steam Generator Water Level.Caused by Operator Error. Post-trip Evaluations Performed.No Abnormalities Noted + (ML20105B398)
- 1CAN099204, Monthly Operating Rept for Aug 1992 for Arkansas Nuclear One Unit 1 + (ML20105B402)
- JAFP-92-0652, Monthly Operating Rept for Aug 1992 for Ja Fitzpatrick Nuclear Power Plant + (ML20105B403)
- ML20105B407 + (ML20105B407)
- 2CAN099204, Monthly Operating Rept for August 1992 for Arkansas Nuclear One Unit 2 + (ML20105B414)
- ML20105B416 + (ML20105B416)
- ML20105B420 + (ML20105B420)
- ML20105B425 + (ML20105B425)
- 05000454/LER-1984-020, :on 841125 & 28,source Range Channel N32 Indicated Noise Spikes on Four Occasions,Resulting in Containment Evacuation Alarms.Cause Under Investigation. Source Range Channel Modified + (ML20105B434)
- 05000278/LER-1985-003, :on 850109,during Surveillance Testing of HPCI Logic Sys,Hpci Turbine Could Not Be Tripped & Declared Inoperable.Caused by Relay Piston Binding Due to Paraffin on Piston.Piston Cleaned + (ML20105B450)
- ML20105B473 + (ML20105B473)
- ML20105B480 + (ML20105B480)
- ML20105B494 + (ML20105B494)
- ML20105B504 + (ML20105B504)
- ML20105B505 + (ML20105B505)
- ML20105B522 + (ML20105B522)
- ML20105B523 + (ML20105B523)
- ML20105B525 + (ML20105B525)
- ELV-03998, Monthly Operating Repts for August 1992 for Vogtle Electric Generating Plant + (ML20105B528)
- ML20105B529 + (ML20105B529)